INSTALLATION INSTRUCTIONS
5
2
1
2
A
B
WARNING
Vanity (A)
MUST
be secured to wall.
Note:
Clean area where the vanity (A) will be
permanently located prior to beginning installation,
ensuring the vanity (A) will not interfere with any
water supply and drain lines once mounted.
2. With two people, carefully place vanity (A) with
Top (B) against the wall in its final location.
While holding the vanity base firmly against the
wall, use the pre-assembled levelers on the
bottom of each leg of the vanity (A) to level the
item. Twisting the levelers counterclockwise
will raise the height of the vanity (A), and
twisting them clockwise will lower the vanity.
Once the vanity is in place, against the wall,
and level from front to back and side to side,
drill a hole through the vanity mounting area
and into the wall studs (as illustrated in
diagram 2). Using appropriate mounting
hardware (not included), secure the vanity (A)
to a wall stud. If possible, secure the vanity
(A) to two wall studs for increased stability.
3. To reinstall drawers into vanity (A), fully extend
metal glide tracks. Gently lower and slide
drawer box into rear glide catch. Next lower
drawer box down to completely rest on
extended glides. Then, push plastic levers to
lock the drawer box in place.
Repeat for remaining drawers.
Note:
To adjust the drawer box height, spin
the adjustment wheel to the left to raise the
drawer box or spin the adjustment wheel to
the right to lower the drawer box. You can
adjust the left and right side glide heights
independently in order to find the drawers best
alignment position.
CAUTION
DO NOT
force drawer or damage to glide may
occur. If drawer does not slide in with ease,
remove and try again from the start.
3
A
B
1
2
3