4 INSTALLATION
INSTRUCTIONS
4.7
Testing
the
Installation
Testing
Voltage
The LCD illuminates when the Mini Meter devices has a proper power supply. Voltage
should also be tested using an AC voltmeter to verify that the voltage across voltage
line terminals (L1 to Neutral and L2 to Neutral) is not in excess of the maximum rated
voltage.
Load LED
The load LED is described in section 3.2. This LED should be cycling at 50% duty
cycle when the meter is connected properly and a sufficient load is applied.
16
WEB
VERSION
Содержание 6P201-C02
Страница 2: ...WEB VERSION ...
Страница 23: ...WEB VERSION ...
Страница 24: ... 2018 Leviton Mfg Co Inc DI 000 MMSMT 00B WEB VERSION ...