11
where you put the switch should be clean, smooth, level and sturdy. Make sure there is
enough clearance around the switch to allow attachment of cables, power cord and allow
air circulation.
Attaching Rubber Pads
A. Make sure mounting surface on the bottom of the switch is grease and dust free.
B. Remove adhesive backing from your Rubber Pads.
C. Apply the Rubber Pads to each corner on the bottom of the switch. These footpads
can prevent the switch from shock/vibration.
Power On
Connect the power cord to the power socket on the rear panel of the switch. The other
side of power cord connects to the power outlet. The internal power supply of the switch
works with voltage range of AC in the 100-240VAC/ Frequency of 50~60Hz, and the
redundant power of DC 48V. Check the power indicator on the front panel to see if power
is properly supplied.
Содержание GSW-0891
Страница 1: ...GSW 0891 8 Port PoE Fast Ethernet TP 2 Port Gigabit Combo L2 SNMP Switch User Manual Ver 1 00 0711...
Страница 21: ...15 Segment Bridge application...
Страница 87: ...81 SNMP V3 configuration interface...
Страница 90: ...84 rule Click Apply QoS Configuration interface...
Страница 93: ...87 IGMP Configuration interface...
Страница 102: ...96 All MAC Address interface...
Страница 110: ...104 Dimensions 270mm W x 210mm D x 44mm H...