- 3 -
2. Equipment Installation
■ It is installed in the rack
Install the switch on a 19-inch standard rack, and the installation steps are as follows:
1. Check the grounding and stability of the rack;
2. Install the two L-shaped brackets in the accessories on both sides of the switch panel, and fix
them with the screws in the accessories;
3. Place the switch in the appropriate location of the rack, and support itusing a tray;
4. Secure the L-shaped brackets on the guide slots fixed at both ends of the rack, to ensure that the
switch can be mounted on the rack in astable, horizontal manner;
5. Use a power cord to connect the switch power connector with the powersocket.
■ Installed on the working table
Install the switch on a working table, and the installation steps are as follows:
1.
Place the switch with its bottom up on a sufficiently large, stable and properly-grounded working
table;
2.
Remove the adhesive protective paper from the foot pad, and stick the 4 pads in the 4round slots
at the bottom of the casing respectively;
3.
Flip over the switch, and place it on the working tablestably;
4.
Use a power cord to connect the switch power connector with the powersocket.
5.
The switch uses 100-240V, 50/60Hz AC, and make sure that both power supply and grounding
are normal before power on.
6.
After power on, please check the switch's power indicator (Power) is on, and if so, it indicates that
the power supply is connected properly.
7.
Do not place heavy objects on the top of the switch.
Содержание GEP - 5271
Страница 1: ...Quick Installation Guide GEP 5271 HW V1 QIG V1 0...
Страница 2: ......