Remove the mattress from the bed
(Figure 1).
Put the mattress back onto the bed
on top of the Turn All
®
system.
(Figure 3).
The Turn All
®
pump (D) is placed on
the bed end using the two braces
on the back of the pump (Figure 3).
Insert the hose connection (B) into
the pump (D) (Figure 4).
Place the Turn All
®
system (A) on the
bed base.
Orient the system so that the hose
connection (B) is at the foot end of
the bed (Figure 2).
Attach the Turn All
®
system to the
bed base using the straps (C) on the
cover (Figure 2).
A
B
Installation of the Turn All
®
system on the bed
Figure 4
B
D
medical
®
C
1
2
3
4
D
Turn All
®
Turn All
®
Bed
Bed
Bed
Mattress
Mattress
Figure 1
Figure 2
Figure 3
Quick guide 1
Installation
*
For more information
read the user guide
EN
1C - 3C
Quick guides