Lesite
Providing best plastic welding tools
Fuzhou Lesite Plastics Welding Technology Co.,Ltd
Website
:
www.lesiteweld.com
Email: [email protected]
Mob: 86-18650793446
Add:16th building, Juyuanzhou Park,
Jinshan Industry Area, No.618 Jinshan Road
Cangshan Area,
Fuzhou, Fujian, China
Tel:
:
86-591- 83818890
Fax
:
86-591-88211499
Power tube disruption
Replace power tube or control box assembly
Hot wedge do not
heat
Tubular
electric
heating
element damaged
Replace hot wedge assembly
Thermocouple failure
Replace thermocouple
Temperature
control
knob
loosened
Tighten temperature control knob
Temperature control circuit
board damaged
Replace temperature control circuit board or control
box assembly
Hot
wedge
is
burned red
Thermocouple failure
Replace thermocouple
Controlled silicon disruption
Replace controlled silicon or control box assembly
Chain jumping
There may be sand or small
stones on chain and gear
Remove sand or small stones
9. Maintenance
The complete machine should be cleaned, greased and placed in a dry place if it is not used.
For PVC welding, the adhesions on hot wedge should be cleaned off if it is not used longer than 4
hours to prevent wedge corrosion and service life being shortened.
Recommend: for welding of material that corrosive gas may be produced after hot fusing such as
PVC and the like, stainless steel hot wedge (optional accessory) is preferred for extending of service life.
10. Supplied accessories
Protector tube 4A 2 pcs
1A 2 pcs
Cross rubber pad for coupling 1 pcs
Philips driver
1 pcs
Inner hexagonal spanner 3 pcs
Silica gel wheel 1 pair