background image

10

2020.01 / b

Electric Power Generation

Installation and maintenance

LSA PMR 320

Alternator for rail application - 8-pole

5785 en -

4.6 - Dismantling, reassembly

During the warranty period, this 

operation should only be carried out in 

an approved workshop or in our factory, 

otherwise the warranty may be 

invalidated.

Check how much the machine weighs 

before choosing the lifting method.

 

• Tools required

To  fully  dismantle  the  machine,  we 

recommend using the tools listed below:

- 1 ratchet s extension

- 1 torque wrench

- 1 set of flat spanners: 7, 8, 10, 12 mm

-  1  socket  set:  8,  10,  13,  16,  18,  21,  22,  

24 mm 

- 1 Allen key: size 5 (eg. Facom: ET5), size 6 

(ET6), size 10 (ET10, size 14 (ET14)

- 1 T20 and T30 TORX bit

- 1 puller (U35)/(U32/350)

• Screw tightening torque

See section 5.4.

• Access to connections

The terminals are accessed directly by 

removing the terminal box cover [136]. 

• Replacing the DE bearing

- Remove the alternator from the genset.

- Remove the DE protective grille [33].

- Remove the screws [62] holding the bearing 

retainer (68) in place.

- Remove the screws [31] holding the DE 

shield [30] on the frame.

- Pull on the DE shield to separate it from the 

frame with a suitable tool (which we can 

provide).

- The rotor will stick to the stator, and is likely 

to make a noise.

- Remove the circlip [67] from the DE bearing 

[60].

- Push the bearing retainer [68] back along 

the shaft.

- Pull out the DE bearing [60].

- Fit the new DE bearing, taking care not to 

overheat it.

- Refit the DE shield [30] by repeating these 

steps in reverse order.

- Grease and fit a new seal.

• Replacing the NDE bearing

- Remove the alternator from the genset.

- Remove the cover plate from the NDE 

shield [73].

- Open the terminal box (132).

- Undo the power connections [124] and 

sensors [197].

- Detach the clamps holding the wiring in the 

terminal box and the NDE shield [36].

- Undo the screws [62] holding the bearing 

retainer (68) in place.

- Remove the screws [37] holding the shield 

on the frame.

- Remove the DE shield with a suitable tool 

(which we can provide).

- The rotor will stick to the stator, and is likely 

to make a noise.

- Push the bearing retainer [68] back along 

the shaft.

- Pull out the NDE bearing [60].

- Fit the new NDE bearing, taking care not to 

overheat it.

-  Refit  the  NDE  shield  [36]  by  repeating 

these steps in reverse order.

4.7 - Table of characteristics

Table of average values: 

alternator - 8-pole - 800 rpm to 2000 rpm

All values are given at ± 10% (for exact 

values,  consult  the  test  report)  and  are 

subject to change without prior warning.

• Resistance at 20°C - L/N stator:

0.0245 ohms

• No-load voltage as a function of            

the speed

Speed (rpm)

U1-2 (V)

800

590

1000

730

1200

885

1400

1020

1600

1180

1800

1330

2000

1470

• Total weight: 

900 kg - 

Rotor:

 

330 kg

WARNING

Содержание Nidec LSA PMR 320

Страница 1: ...4 60 67 30 349 68 31 79 68 60 69 1 77 124 197 21 62 33 LSA PMR 320 Alternator for rail application 8 pole Installation and maintenance...

Страница 2: ...hould be positioned as shown in the drawing below once the machine has been fully installed WARNING The alternators must not be put into service until the machines in which they are to be incorporated...

Страница 3: ...2 2 Mechanical characteristics 5 3 INSTALLATION 5 3 1 Assembly 5 3 2 Checks prior to first use 5 3 3 Terminal connection diagrams 6 3 4 Commissioning 7 4 SERVICING MAINTENANCE 8 4 1 Safety measures 8...

Страница 4: ...tect any malfunction 1 3 Identification The alternator is identified by means of a nameplate fixed on the machine see drawing Make sure that the nameplate on the machine conforms to your order So that...

Страница 5: ...t be ho rizontal Check how much the machine weighs before choosing the lifting tool During this operation do not allow anyone to stand under the load Handling The generously sized lifting eyes are for...

Страница 6: ...n of rotation is clock wise as seen from the drive end phase rotation in order 1 2 3 For anti clockwise rotation swap 2 and 3 3 3 Terminal connection diagrams Any intervention on the alternator termin...

Страница 7: ...d the cabinet are made in accordance with the connection diagram there is no short circuit phase phase or phase neutral between the alternator output terminals and the cabinet the machine should be co...

Страница 8: ...s of operation check that all fixing bolts on the machine are still tight plus the general state of the machine and the various electrical connections in the installation Electrical servicing Commerci...

Страница 9: ...ation Misalignment coupling Defective mounting or play in coupling Rotor balancing fault Excessive vibration and humming noise coming from the machine Phase imbalance Stator short circuit Abnormal noi...

Страница 10: ...make a noise Removethecirclip 67 fromtheDEbearing 60 Push the bearing retainer 68 back along the shaft Pull out the DE bearing 60 Fit the new DE bearing taking care not to overheat it Refit the DE shi...

Страница 11: ...ist To ensure that our products operate correctly and safely we recommend the use of original manufacturer spare parts In the event of failure to comply with this advice the manufacturer cannot be hel...

Страница 12: ...71 37 36 4 60 67 30 349 68 31 79 68 60 69 1 77 124 197 21 43 42 132 136 62 69 73 62 33 Installation and maintenance LSA PMR 320 Alternator for rail application 8 pole 5785 en 5 4 Exploded view parts...

Страница 13: ...8 2 Inner bearing retainer 21 4 Lifting eye M16 100 69 3 Bleeder 30 1 DE shield 71 1 NDE shield cover 31 12 Fixing bolt M10 40 73 1 Cover plate 33 1 Protective grille M6 4 77 2 Grease nipple 36 1 NDE...

Страница 14: ...and melting processes Our technical support depart ment can provide detailed directions on how to dismantle products on request Waste hazardous materials The following components and materials requir...

Страница 15: ...ient repair support and maintenance services Trust your alternator maintenance and support to electric power generation experts Our field personnel are 100 qualified and fully trained to operate in al...

Страница 16: ...www emersonindustrial com 2020 01 b www leroy somer com epg 5785 en Linkedin com company leroy somer Twitter com Leroy_Somer_en Facebook com LeroySomer Nidec en YouTube com LeroySomerOfficiel...

Отзывы: