![Leonton REG5-2602-2C Series Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/leonton/reg5-2602-2c-series/reg5-2602-2c-series_user-manual_1882901017.webp)
13
Hardware Installation
Installation Steps
This section will explain how to install REG5-2602-2C series.
Caution:
This device is intended for use indoor and at altitudes up to 2000 meters.
Caution:
The device is intended to be installed in an industrial control enclosure and panel
Installation Steps
Step 1.
Unpack the industrial Ethernet switch from the original packing box.
Step 2.
Check if the rack-mount bracket is screwed on the industrial Ethernet switch.
•
If the rack-mount bracket is not screwed on the industrial Ethernet switch, please
refer to the Rack Mounting section for rack-mount bracket installation.
Step 3.
Power on the industrial Ethernet switch and then the power LED light will turn on.
•
If you need help on how to wire power, please refer to the Wiring the Power Inputs
section.
•
Please refer to the LED Indicators section for LED light indication.
Step 4.
Prepare the twisted-pair, straight-through category 5 cable for Ethernet connection.
Step 5.
Insert one side of the RJ-
45 cable into switch’s Ethernet port and on the other side into
the networking device’s Ethernet port, e.g. switch PC or server. The Ethernet port’s
(RJ-45) LED on the industrial Ethernet switch will turn on when the cable is connected
to the networking device.
•
Please refer to the LED Indicators section for LED light indication.
Step 6.
When all connections are set and the LED lights all show normal, the installation is
complete.