15
Hardware Installation
Installation Steps
This section will explain how to install EG5-1202-SFP series: 10-port industrial gigabit managed
Ethernet switch with 8*10/100/1000Tx Gigabit Ethernet, and 2*100/1000 SFP slots.
Caution:
This device is intended for use indoor and at altitudes up to 2000 meters.
Caution:
The device is intended to be installed in an industrial control enclosure and panel
Installation Steps
Step 1
Unpack the industrial Ethernet switch from the original packing box.
Step 2
Check if the DIN-Rail bracket is screwed on the industrial Ethernet switch.
•
If the DIN-Rail is not screwed on the industrial Ethernet switch, please refer to the
DIN-Rail Mounting
section for DIN-Rail installation.
•
If you want to wall mount the industrial Ethernet switch, please refer to the
Wall
Mounting
section for wall mounting installation.
Step 3
To hang the industrial Ethernet switch on a DIN-Rail or wall, please refer to the
Mounting Installation
section.
Step 4
Power on the industrial Ethernet switch and then the power LED light will turn on.
•
If you need help on how to wire power, please refer to the
Wiring the Power Inputs
section.
•
Please refer to the
LED Indicators
section for LED light indication.
Step 5
Prepare the twisted-pair, straight-through category 5 cable for Ethernet connection.
Step 6
Insert one side of the RJ-45 cable into switch’s Ethernet port and on the other side
into the networking device’s Ethernet port, e.g. switch PC or server. The Ethernet
port’s (RJ-45) LED on the industrial Ethernet switch will turn on when the cable is
connected to the networking device.
•
Please refer to the
LED Indicators
section for LED light indication.
Step 7
When all connections are set and the LED lights all show normal, the installation is
complete.