![Lenz Flowmould 1.0 Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/lenz/flowmould-1-0/flowmould-1-0_instructions-for-use-manual_1881873009.webp)
9
Lenz Ges.m.b.H.
Staudachstraße, 3
6858 Schwarzach
Austria
4.2 Mounting
4.3 Installation
4.1
Transport and unpacking
The machinery is loaded on a pallet and then packed in a cardboard box.
The total weight of the machinery and the packaging combined is over 75 kg, the-
refore every movement of the packaging must be performed with specific handling
equipment (transpallet, forklift).
To unpack the machinery, use specific cutting tool to open the cardboard box, and
then unload the components from the pallet.
During these operations, the user must use personal protective equipment such as
protective gloves to reduce the risk of injuries.
At least three people at the same time, considering the weight of the base (> 60
kg), should perform the unloading of the base of the machinery.
The machinery is shipped divided in two parts, the base and the support for the
control panel.
Therefore, the machinery should be mounted before its installation.
The mounting is performed by inserting the pole in the specific cavity on the ma-
chinery and subsequently fixing the two parts with the supplied screws (see image
in the back cover).
The installation of the machinery is performed by levelling it using the adjustable
feet and then by inserting the plug in a socket for the electrical power supply.
The machinery should be horizontal for proper operation.
The machinery is equipped with a type F plug (see images in the back cover).
4 - Transport, unpacking, installation