1. Read the safety information and installation guidelines (see “Safety” on page iii and “Installation
2. Touch the static-protective package that contains the component to any unpainted metal surface on the
server; then, remove it from the package and place it on a static-protective surface.
3.
Watch the procedure
. A video of this procedure is available from the following links:
• https://www.youtube.com/playlist?list=PLYV5R7hVcs-B2y7oAb54mfyuLrIusa_qE
• http://list.youku.com/albumlist/show/id_50483449
To install a hot-swap fan, complete the following steps:
Step 1. Align the fan over the fan slot in the fan cage assembly.
Figure 52. Hot-swap fan installation
Step 2. Insert the fan into the fan cage assembly until it clicks into place.
Attention:
When replacing a fan with power on, complete the replacement within 30 seconds to
ensure proper operation.
After installing the hot-swap fan. complete the following steps:
1. Reinstall the top cover (see “Install the top cover” on page 131).
2. Install the server in the rack.
Front VGA assembly replacement
Use this procedure to remove or install the front VGA assembly.
Remove the front VGA assembly
Use this procedure to remove the front VGA assembly.
Before removing the front VGA assembly:
66
ThinkSystem SR850 Maintenance Manual
Содержание ThinkSystem SR850
Страница 1: ...ThinkSystem SR850 Maintenance Manual Machine Type 7X18 and 7X19 ...
Страница 8: ...vi ThinkSystem SR850 Maintenance Manual ...
Страница 58: ...50 ThinkSystem SR850 Maintenance Manual ...
Страница 142: ...134 ThinkSystem SR850 Maintenance Manual ...
Страница 166: ...158 ThinkSystem SR850 Maintenance Manual ...
Страница 170: ...162 ThinkSystem SR850 Maintenance Manual ...
Страница 174: ...Taiwan BSMI RoHS declaration 166 ThinkSystem SR850 Maintenance Manual ...
Страница 176: ...168 ThinkSystem SR850 Maintenance Manual ...
Страница 182: ...174 ThinkSystem SR850 Maintenance Manual ...
Страница 183: ......
Страница 184: ...Part Number SP47A24295 Printed in China 1P P N SP47A24295 1PSP47A24295 ...