CAUTION:
Eye protection should be worn for this procedure.
Watch the procedure.
A video of this procedure is available from the following links:
• YouTube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-DOG7dnH9Zxy67Q3dez4ZsM
• Youku:
https://list.youku.com/albumlist/show/id_59715555
Procedure
Step 1. Face the bottom side of the carton, remove the carton top, and slit the two carton corners on your
right-hand side with a knife. Then, fold the right carton panel down to the ground, and rotate the
threes carton inserts down.
104
ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide
Содержание ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet
Страница 1: ...ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide Machine Type 7D6D ...
Страница 4: ...ii ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Страница 16: ...12 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Страница 23: ...Figure 19 Rising the leveling pads Chapter 3 Rack cabinet setup 19 ...
Страница 145: ...Figure 159 Installing a rear cable management bracket Chapter 5 Hardware removal installation and reversion 141 ...
Страница 146: ...142 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Страница 152: ...148 ThinkSystem Heavy Duty Full Depth 42U Rack Cabinet User Guide ...
Страница 153: ......
Страница 154: ......