
DANGER
Electrical current from power, telephone, and communication cables is hazardous.
To avoid a shock hazard:
• Do not connect or disconnect any cables or perform installation, maintenance, or reconfiguration
of this product during an electrical storm.
• Connect all power cords to a properly wired and grounded electrical outlet.
• Connect to properly wired outlets any equipment that will be attached to this product.
• When possible, use one hand only to connect or disconnect signal cables.
• Never turn on any equipment when there is evidence of fire, water, or structural damage.
• Disconnect the attached power cords, telecommunications systems, networks, and modems
before you open the device covers, unless instructed otherwise in the installation and
configuration procedures.
• Connect and disconnect cables as described in the following table when installing, moving, or
opening covers on this product or attached devices.
Table for Safety Statement 1 that explains the steps to connect and disconnect cables.
To Connect:
To Disconnect:
1. Turn everything OFF.
2. First, attach all cables to devices.
3. Attach signal cables to connectors.
4. Attach power cords to outlet.
5. Turn device ON.
1. Turn everything OFF.
2. First, remove power cords from outlet.
3. Remove signal cables from connectors.
4. Remove all cables from devices.
Statement 13
DANGER
Overloading a branch circuit is potentially a fire hazard and a shock hazard under certain
conditions. To avoid these hazards, ensure that your system electrical requirements do not exceed
branch circuit protection requirements. Refer to the information that is provided with your device
for electrical specifications.
Содержание 46M4002
Страница 1: ...1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...
Страница 24: ...16 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...
Страница 30: ...22 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...
Страница 34: ...26 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...
Страница 56: ...48 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...
Страница 60: ...52 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...
Страница 62: ...54 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...
Страница 68: ...60 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...
Страница 70: ...62 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...
Страница 74: ...66 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...
Страница 82: ...Taiwan BSMI RoHS declaration 74 1U C19 and C13 Switched and Monitored PDUs Installation and Maintenance Guide ...
Страница 85: ......
Страница 86: ......