IMPORTANT

Use a thermocouple or thermistor electronic vacuum
gauge that is calibrated in microns. Use an instrument
that reads from 50 microns to at least 10,000 microns.

 1 − Connect manifold gauge set to the service valve ports :

 

 

low pressure gauge to 

vapor 

line service valve

 

 

high pressure gauge to 

liquid 

line service valve

 2 − Connect micron gauge.

 3 − Connect the vacuum pump (with vacuum gauge) to the

center port of the manifold gauge set.

 4 − Open both manifold valves and start the vacuum

pump.

 5 − Evacuate the line set and indoor unit to an 

absolute

pressure

 of 23,000 microns (29.01 inches  of mercu-

ry). During the early stages of evacuation, it is desirable
to close the manifold gauge valve at least once to deter-
mine if there is a rapid rise in 

absolute pressure

. A

rapid rise in pressure indicates a relatively large leak. If
this occurs, repeat the leak testing procedure.

NOTE  The term 

absolute pressure

 means the total ac-

tual pressure within a given volume or system, above the
absolute zero of pressure. Absolute pressure in a vacuum
is equal to atmospheric pressure minus vacuum pressure.

 6 − When the absolute pressure reaches 23,000 microns

(29.01 inches  of mercury), close the manifold gauge
valves, turn off the vacuum pump and disconnect the
manifold gauge center port hose from vacuum pump.
Attach the manifold center port hose to a nitrogen cylin-

der with pressure regulator set to 150 psig (1034 kPa)
and purge the hose. Open the manifold gauge valves to
break the vacuum in the line set and indoor unit. Close
the manifold gauge valves.

CAUTION

Danger of Equipment Damage.
Avoid deep vacuum operation. Do not use compres-
sors to evacuate a system.
Extremely low vacuums can cause internal arcing
and compressor failure.
Damage caused by deep vacuum operation will void
warranty.

 7 − Shut off the nitrogen cylinder and remove the manifold

gauge hose from the cylinder. Open the manifold
gauge valves to release the nitrogen from the line set
and indoor unit.

 8 − Reconnect the manifold gauge to the vacuum pump,

turn the pump on, and continue to evacuate the line set
and indoor unit until the absolute pressure does not rise
above 500 microns (29.9 inches of mercury) within a
20−minute period after shutting off the vacuum pump
and closing the manifold gauge valves.

 9 − When the absolute pressure requirement above has

been met, disconnect the manifold hose from the vacu-
um pump and connect it to an upright cylinder of
HFC−410A refrigerant. Open the manifold gauge valves
to break the vacuum from 1 to 2 psig positive pressure in
the line set and indoor unit. Close manifold gauge valves
and shut off theHFC−410A cylinder and remove the
manifold gauge set.

Содержание SPBH4 Series

Страница 1: ...ng excessive force or rapid motion can result in personal injury Be aware of and use caution when working near these areas during installation or while servicing this equipment Information contained i...

Страница 2: ...meter in 5 16 5 16 5 16 No of rows 2 2 2 Fins per inch 22 22 22 Outdoor Fan Diameter in 22 22 26 No of blades 4 4 3 Motor hp 1 6 1 4 1 3 Cfm 3150 3980 4380 Rpm 844 836 850 Watts 215 305 280 Shipping D...

Страница 3: ...meter in 5 16 5 16 5 16 No of rows 2 2 2 Fins per inch 22 22 22 Outdoor Fan Diameter in 22 22 26 No of blades 4 4 3 Motor hp 1 6 1 4 1 3 Cfm 3150 3980 4380 Rpm 844 836 850 Watts 215 305 280 Shipping D...

Страница 4: ...ed equipment is re moved from original installation site Warranty will not cover damage or defect resulting from Flood wind lightning or installation and operation in a corrosive atmosphere chlorine f...

Страница 5: ...s clear the slots see figure 1 De tail B 3 Move panel down until lip of upper tab clears the top slot in corner post see figure 1 Detail A Position and Install Panel Position the panel almost parallel...

Страница 6: ...Unit may have multiple power supplies 2 Dual Capacitor C12 The compressor and fan in SPB H4 series units use perma nent split capacitor motors The capacitor is located inside the unit control box see...

Страница 7: ...ill enter a lockout condition The 5 strike pressure switch lockout condition can be reset by cycling OFF the 24 volt power to the control board or by shorting the TEST pins between 1 and 2 seconds All...

Страница 8: ...ge line tempera ture shown in figure 7 exceeds a temperature of 300 F 148 C during compressor operation the board will de en ergize the compressor contactor output and the defrost output if active The...

Страница 9: ...he actual difference between the clear coil and frosted coil temperatures exceeds the maxi mum difference allowed by the control a defrost cycle will be initiated IMPORTANT The demand defrost control...

Страница 10: ...e Demand Defrost Control Y1 Active Place a jumper on TEST pins for longer than one second but less than two seconds Clears any short cycle lockout and five strike fault lockout function if applicable...

Страница 11: ...refrigerant charge in system 3 Improper metering device installed or incorrect operation of metering device 4 Incorrect or improper sensor location or connection to sys tem 1 Remove any blockages or r...

Страница 12: ...he liquid is worked toward the center of the scroll and is discharged Due to its efficiency the scroll compressor is capable of drawing a much deeper vacuum than reciprocating com pressors Deep vacuum...

Страница 13: ...ing mecha nism to open two by pass ports in the first compression pocket of the scrolls in the compressor The internal sole noid is activated by a 24 volt direct current solenoid coil The coil power r...

Страница 14: ...TE Block outdoor coil to maintain a minimum of 375 psig during testing 7 Record all of the readings for the Y1 demand on table 3 8 Close switch to energize Y2 demand 9 Allow pressures and temperatures...

Страница 15: ...Confirm internal unloader solenoid has prop er resistance 1 Shut all power off to unit main and low voltage 2 Unplug the molded plug from the compressor solenoid 2 pin fusite 3 Using a volt meter set...

Страница 16: ...d when the pressure drop across the filter drier is greater than 4 psig To safeguard against moisture entering the system follow the steps in section IV sub section B Evacuating the System when replac...

Страница 17: ...OR COIL COIL SENSOR FIGURE 19 SPB H4 HEATING CYCLE SHOWING MANIFOLD GAUGE CONNECTIONS OUTDOOR COIL EXPANSION CHECK VALVE BI FLOW FILTER DRIER TO HFC 410A DRUM LOW PRESSURE HIGH PRESSURE COMPRESSOR REV...

Страница 18: ...p with an adjustable wrench 2 Use a service wrench with a hex head extension to back the stem out counterclockwise as far as it will go NOTE Use a 3 16 hex head extension for 3 8 line sizes or a 5 16...

Страница 19: ...410A into the line set and indoor unit Weigh in a trace amount of HFC 410A A trace amount is a maxi mum of 2 ounces 57 g or 3 pounds 31 kPa pressure Close the valve on the R 410A cylinder and the valv...

Страница 20: ...pump and disconnect the manifold gauge center port hose from vacuum pump Attach the manifold center port hose to a nitrogen cylin der with pressure regulator set to 150 psig 1034 kPa and purge the hos...

Страница 21: ...ose in table 2 If subcooling value is greater than shown recover some refrigerant if less add some refrigerant TABLE 2 SPB036H4 Subcooling Values for Charging Second Stage High Capacity SSB H4S41Y thr...

Страница 22: ...309 75 334 72 323 70 40 4 4 322 92 354 89 318 69 50 10 336 113 381 108 329 82 1 These are most popular match up pressures Indoor match up indoor air quality and indoor load cause pressures to vary 2...

Страница 23: ...airflow as illustrated in figure 23 to be sure the indoor airflow is as required Make any air flow adjustments before continuing with the following procedure 2 Measure outdoor ambient temperature dete...

Страница 24: ...17 7 0 0 CBX32MV 068 16 10 0 3 CH33 60D 2F 18 4 0 2 CH33 62D 2F 15 10 0 4 CR33 60 40 4 0 2 CX34 60D 6F 18 4 0 2 CX34 62D 6F 16 8 0 2 Table 8 SSB060H4S44Y INDOOR HEAT MATCHUP PUMP Target Subcooling Hea...

Страница 25: ...036 230 22 7 0 9 CBX27UH 042 230 24 11 3 0 CBX32M 036 22 7 0 9 CBX32MV 036 22 7 0 9 CBX32MV 048 24 11 3 0 CBX40UHV 030 22 7 0 9 CBX40UHV 036 22 7 0 9 CBX40UHV 042 24 11 3 0 CBX40UHV 048 24 11 3 0 CH33...

Страница 26: ...469 5 37 111 4 68 194 1 99 312 7 130 475 6 38 113 6 69 197 3 100 317 2 131 481 6 39 115 8 70 200 6 101 321 8 132 487 8 40 118 0 71 203 9 102 326 4 133 494 0 41 120 3 72 207 2 103 331 0 134 500 2 42 1...

Страница 27: ...ils for evidence of oil leaks B Indoor Coil 1 Clean coil if necessary 2 Check connecting lines and coils for evidence of oil leaks 3 Check the condensate line and clean it if necessary C Indoor Unit 1...

Страница 28: ...Page 28 VIII WIRING DIAGRAM AND SEQUENCE OF OPERATION...

Страница 29: ...Page 29 Figure 26 Unit Wiring Diagram 036 and 048 Sizes SPB H4S45Y...

Страница 30: ...Page 30 Figure 27 Unit Wiring Diagram 060 Size Only SPB H4S45Y...

Страница 31: ...he defrost board sends 24 volts through Y2 OUT to the L34 compressor solenoid plug The 2 wire com pressor solenoid plug converts the 24volt AC outputs to a 24volt DC signal input to the L34 internal h...