75
Installation and Maintenance
Service Manual
Procedure
Step
6. Remove electric box assy
a
b
c
①
Cut off the wire binder and pull out the
indoor tube temperature sensor.
②
Screw off one grounding screw.
③
Remove the wiring terminals of motor
andstepping motor.
④
Remove the electric box assy.
⑤
Screw off the screws that are locking each.
Loosen the connection clasps between
Cold plasma generator and electric
box, and then remove the cold plasma
generator.
Rotate the electric box assy. Twist off the
screws that are locking the wire clip and
loosen the power cord. Remove the wiring
terminal of power cord. Lift up the main
board and take it off.
Electric box
Cold plasma generator
Grounding
screw
Indoor tube
temperature sensor
Electric box assy
Main board
Wiring terminal
of motor
Wiring terminal
of stepping motor
Screw
Screw
Wire clip
Circlip
Holder
Connector
Soft sheath
Power cord
Wire binder
Step motor
Screws
Clasps
Instruction: Some wiring terminal of this
product is with lock catch and other devices.
The pulling method is as below:
1.Remove the soft sheath for some terminals
at first, hold the circlip and then pull out the
terminals.
2.Pull out the holder for some terminals at
first (holder is not available for some wiring
terminal), hold the connector and then pull the
terminal.