background image

Page 6

LGH036-360 Agency

Typical Gas Heat Schematic

New Form No.

Supersedes

WIRING DIAGRAM

GAS HEAT, 130, 180 AND 240

07/18

HEATING

SECTION A

REV. 0

537705-03

537705-04

KEY

DESCRIPTION

A3

CONTROL, BURNER 1

A55

CONTROL, MAIN BOARD LENNOX

B6

MOTOR COMBUSTION AIR BLOWER

C3

CAPACITOR, COMB AIR BLOWER 1

E1

SPARK

FS1

SENSOR FLAME

GV1

VALVE GAS 1

HR6

HEATER, -50C LOW AMBIENT KIT

J15

JACK, BURNER 1

J19

JACK, COMBUSTION AIR BLOWER 1

J135

JACK, PRIMARY LIMIT

J228

JACK, VESTIBULE HEATER

J229

JACK, VESTIBULE HEATER CONTROL 1

J265C

JACK, CONTACTOR RELAY

J266A

JACK, HEATING CONTROL STG 1

J271A,B JACK, HEATING SENSORS STG 1
K13,-1

RELAY, COMBUSTION AIR BLOWER

K123, -1 RELAY, SINGLE THROW LIMIT
K125,-1 RELAY, HEAT SHUT OFF
P15

PLUG, BURNER 1

P19

PLUG, COMBUSTION AIR BLOWER 1

P135

PLUG, PRIMARY LIMIT

P228

PLUG, VESTIBULE HEATER

P229

PLUG, VESTIBULE HEATER CONTROL 1

P265

PLUG, CONTACTOR RELAY

P266

PLUG, HEATING CONTROL

P271

PLUG, HEATING SENSORS STG 1

S10

SWITCH, LIMIT PRIMARY GAS

S18

SWITCH, COMBUSTION AIR BLOWER PROOF

S47

SWITCH FLAME ROLLOUT BURNER

S59

TSTAT, OPEN -20F, CLOSE 10F

S60

TSTAT, OPEN 20F, CLOSE -10F

S61

TSTAT, OPEN 50F, CLOSE 20F

T3

TRANSFORMER COMB AIR BWR 1

S60

S61

S59 (1)

CAB

(24 VAC)

S10-C

S10-NC

S10-NO
S21-C

S21-NC

H1

S47
S47

S18

S18

GV1

A8,

K15

W2,

K16

1

2

3

4

5

6

7

8

9

10

2

3

1

K13

P265

J265D

9

COMM

P266

J266A

B

P271 J271

A55

FROM F10

F10 USED ON UNITS WITH SCCR OPTION

F10

FUSE, OUTDOOR FAN MOTOR

T3 NOT CONNECTED TO F10 ON 575V SCCR UNITS

Содержание LGH 036

Страница 1: ...e replaced and pre filter must be removed upon construction completion The input rate and temperature rise must be set per the unit r ating plate The heat exchanger components duct system air filters...

Страница 2: ...n LGH156 180 210 240 242 300 360 UNIT CLEARANCES C D B A Outdoor Air Hood Number of fans varies by model Figure 3 1 Unit Clearance A in mm B in mm C in mm D in mm Top Clearance Service Clearance 60 15...

Страница 3: ...ocal codes require the installation of such a valve Install a ground joint union between the gas control mani fold and the main manual shut off valve When making piping connections a drip leg should b...

Страница 4: ...NION BOTTOM ENTRY GAS PIPING COMPLETED 7 NIPPLE STREET ELBOW TO GAS SUPPLY TO GAS VALVE Grommets for both gas pipe openings are field provided 2 1 2 NIPPLE Figure 10 High Altitude Derate ULNOx Units U...

Страница 5: ...o measure manifold pressure Start unit and allow 5 minutes for unit to reach steady state 2 After allowing unit to stabilize for 5 minutes record manifold pressure and compare to value given in table...

Страница 6: ...AY COMBUSTION AIR BLOWER K123 1 RELAY SINGLE THROW LIMIT K125 1 RELAY HEAT SHUT OFF P15 PLUG BURNER 1 P19 PLUG COMBUSTION AIR BLOWER 1 P135 PLUG PRIMARY LIMIT P228 PLUG VESTIBULE HEATER P229 PLUG VEST...

Страница 7: ...Page 7 LGH036 360 Agency Typical Unit Schematic...

Страница 8: ...Condenser Fan Relays Capacitor CAB Relay CAB Disconnect Switch Opt Defrost Control KD only Fan Control Board KD only Proper Gas Flow Approximate 1 Operate unit at least 15 minutes before checking gas...

Отзывы: