background image

Page 3

LGH036-360 Agency

Never  test  for  gas  leaks  with  an  open  flame.  Check  all 

connections with a commercially available soap solution 

made specifically for leak detection.

NOTE

 - Furnace must be adjusted to obtain a temperature 

rise (high and low fire) within the range(s) specified on the unit 

nameplate. Failure to do so may cause erratic limit operation.

Canada 

The unit is CSA International (CSA) certified for combina

-

tion heating/cooling for outdoor installations and non-res-

idential use only at the clearances to combustible materi-

als as listed on the unit nameplate. 

Installation of CSA international certified units must con

-

form with current standard CSA B149.1, “Natural Gas and 

Propane Installation Codes” and applicable local codes. 

Authorities having jurisdiction should be consulted before 

installation. 
The unit must be wired and electrically grounded accord-

ing to local codes or, in the absence of local codes, cur-

rent CSA Standard C22.1 Canadian Electrical Code Part 

1. Installation of combination heating/cooling units must 

also conform with current CSA Standard B52 “Mechanical 

Refrigeration Code.”

Connect Gas Piping

A manual main shut-off valve must be installed external to 

the unit when local codes require the installation of such 

a valve. 
Install a ground joint union between the gas control mani-

fold and the main manual shut-off valve. 

When making piping connections a drip leg should be in-

stalled on vertical pipe runs to serve as a trap for sediment 

or condensate. 
A 1/8” N.P.T. plugged tap is located on gas valve for test 

gauge connection. See Figure 4 through Figure 8 for tap 

location. See Figure 9 for gas supply piping entry through 

the side of the unit and Figure 10 for gas piping through 

the bottom of the unit. A kit is required when routing gas 

supply piping through the bottom of the unit. 
Compounds used on threaded joints of gas piping must be 

resistant to the actions of liquified petroleum gases.

HONEYWELL VR8305Q SERIES GAS VALVE

GAS VALVE KNOB IS SHOWN IN 

OFF

 POSITION.

LOW FIRE

ADJUSTMENT

HIGH FIRE

ADJUSTMENT

INLET

PRESSURE

TAP

MANIFOLD

PRESSURE

TAP

FIGURE 4

MANIFOLD

PRESSURE

OUTLET

GAS VALVE SWITCH SHOWN IN ON POSITION.

INLET

PRESSURE

PORT

MANIFOLD

PRESSURE

ADJUSTMENT

SCREW

HONEYWELL VR8215S GAS VALVE

Single-Stage

FIGURE 5

WHITE RODGERS 36J54 GAS VALVE

Two-Stage

GAS VALVE SWITCH SHOWN IN OFF POSITION.

LOW FIRE

ADJUSTMENT

HIGH FIRE

ADJUSTMENT

INLET

PRESSURE

TAP

MANIFOLD

PRESSURE TAP

FIGURE 6

WHITE RODGERS 36H54 GAS VALVE

Two-Stage

LOW FIRE

ADJUSTMENT

HIGH FIRE

ADJUSTMENT

INLET

PRESSURE

TAP

MANIFOLD

PRESSURE

TAP

GAS VALVE SWITCH SHOWN IN

 ON

 POSITION.

FIGURE 7

Содержание LGH 036

Страница 1: ...e replaced and pre filter must be removed upon construction completion The input rate and temperature rise must be set per the unit r ating plate The heat exchanger components duct system air filters...

Страница 2: ...n LGH156 180 210 240 242 300 360 UNIT CLEARANCES C D B A Outdoor Air Hood Number of fans varies by model Figure 3 1 Unit Clearance A in mm B in mm C in mm D in mm Top Clearance Service Clearance 60 15...

Страница 3: ...ocal codes require the installation of such a valve Install a ground joint union between the gas control mani fold and the main manual shut off valve When making piping connections a drip leg should b...

Страница 4: ...NION BOTTOM ENTRY GAS PIPING COMPLETED 7 NIPPLE STREET ELBOW TO GAS SUPPLY TO GAS VALVE Grommets for both gas pipe openings are field provided 2 1 2 NIPPLE Figure 10 High Altitude Derate ULNOx Units U...

Страница 5: ...o measure manifold pressure Start unit and allow 5 minutes for unit to reach steady state 2 After allowing unit to stabilize for 5 minutes record manifold pressure and compare to value given in table...

Страница 6: ...AY COMBUSTION AIR BLOWER K123 1 RELAY SINGLE THROW LIMIT K125 1 RELAY HEAT SHUT OFF P15 PLUG BURNER 1 P19 PLUG COMBUSTION AIR BLOWER 1 P135 PLUG PRIMARY LIMIT P228 PLUG VESTIBULE HEATER P229 PLUG VEST...

Страница 7: ...Page 7 LGH036 360 Agency Typical Unit Schematic...

Страница 8: ...Condenser Fan Relays Capacitor CAB Relay CAB Disconnect Switch Opt Defrost Control KD only Fan Control Board KD only Proper Gas Flow Approximate 1 Operate unit at least 15 minutes before checking gas...

Отзывы: