background image

PACKAGED GAS UNITS

506373-03

8/2021

Supersedes 7/2020

LGH036-360 UNITS

3 THROUGH 30 TONS

See unit nameplate for manufacturer 

and address. 

©2021

INSTALLATION 

INSTRUCTIONS

AGENCY REQUIRED

RETAIN THESE INSTRUCTIONS
FOR FUTURE REFERENCE

Safety

 WARNING

Improper installation, adjustment, alteration, service 

or maintenance can cause property damage, personal 

injury or loss of life. Installation and service must  be 

performed by a licensed professional HVAC installer or 

equivalent, service agency, or the gas supplier.

Use of this unit as a construction heater or air condition-

er is not recommended during any phase of construction. 

Very low return air temperatures, harmful vapors and op-

eration  of  the  unit  with  clogged  or  misplaced  filters  will 

damage the unit. 
If this unit has been used for heating or cooling of build-

ings or structures under construction, the following condi-

tions must be met or the warranty will be void: 
•   The vent hood must be installed per these installation 

instructions. 

•   A room thermostat must control the unit. The use of 

fixed  jumpers  that  will  provide  continuous  heating  or 

cooling is not allowed

• 

 A pre-filter must be installed at the entry to the return 

air duct. 

•   The return air duct must be provided and sealed to the 

unit. 

•   Return air temperature range between 55°F (13°C) and 

80°F (27°C) must be maintained.

• 

 Air filters must be replaced and pre-filter must be removed 

upon construction completion. 

•   The input rate and temperature rise must be set per the 

unit r ating plate. 

• 

 The heat exchanger, components, duct system, air filters 

and evaporator coil must be thoroughly cleaned following 

final construction clean-up. 

• 

 The unit operating conditions (including airflow, cooling op

-

eration, ignition, input rate, temperature rise and venting) 

must be verified according to these installation instructions.

NOTE

 - The Commonwealth of Massachusetts stipulates 

these additional requirements: 

•   

Gas units shall be installed by a licensed plumber or 

gas fitter only. 

• 

The gas cock must be “T handle” type.

The unit is certified for installation on noncombustible floors 
only.  However,  it  may  be  installed  on  wood  flooring,  or  on 
class A,  class  B,  or  class  C  material  covered  floors  when 
used  in  horizontal  discharge  applications  or  in  downflow 

discharge applications when mounted on an LARMF roof 
mounting frame.
Adequate clearance shall be provided around air openings 
into the vestibule area. Provisions shall be made for proper 
operation and for combustion air and ventilation air supply. 
Unit must be adjusted for the temperature rise range and 

within the allowable external static pressure on furnaces with 

a duct system as listed on unit nameplate.

Table of Contents

Safety  . . . . . . . . . . . . . . . . . . . . . . . . . 1
Connect Gas Piping . . . . . . . . . . . . . . . . . . 3
High Alititue Derate.   .   .   .   .   .   .   .   .   .   .   .   .   .   .   .   .   .   . 4
Pressure Test Gas Piping . . . . . . . . . . . . . . . 4
Two Stage Gas Valve Adjustment . . . . . . . . . . . 5
Gas Heat Operation . . . . . . . . . . . . . . . . . . 5
Typical Gas Heat Schematic .   .   .   .   .   .   .   .   .   .   .   .   .   . 6
Typical Unit Schematic .   .   .   .   .   .   .   .   .   .   .   .   .   .   .   .   . 7
Proper Gas Flow .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 8
Repair Parts Listing  . . . . . . . . . . . . . . . . . . 8

Содержание LGH 036

Страница 1: ...e replaced and pre filter must be removed upon construction completion The input rate and temperature rise must be set per the unit r ating plate The heat exchanger components duct system air filters...

Страница 2: ...n LGH156 180 210 240 242 300 360 UNIT CLEARANCES C D B A Outdoor Air Hood Number of fans varies by model Figure 3 1 Unit Clearance A in mm B in mm C in mm D in mm Top Clearance Service Clearance 60 15...

Страница 3: ...ocal codes require the installation of such a valve Install a ground joint union between the gas control mani fold and the main manual shut off valve When making piping connections a drip leg should b...

Страница 4: ...NION BOTTOM ENTRY GAS PIPING COMPLETED 7 NIPPLE STREET ELBOW TO GAS SUPPLY TO GAS VALVE Grommets for both gas pipe openings are field provided 2 1 2 NIPPLE Figure 10 High Altitude Derate ULNOx Units U...

Страница 5: ...o measure manifold pressure Start unit and allow 5 minutes for unit to reach steady state 2 After allowing unit to stabilize for 5 minutes record manifold pressure and compare to value given in table...

Страница 6: ...AY COMBUSTION AIR BLOWER K123 1 RELAY SINGLE THROW LIMIT K125 1 RELAY HEAT SHUT OFF P15 PLUG BURNER 1 P19 PLUG COMBUSTION AIR BLOWER 1 P135 PLUG PRIMARY LIMIT P228 PLUG VESTIBULE HEATER P229 PLUG VEST...

Страница 7: ...Page 7 LGH036 360 Agency Typical Unit Schematic...

Страница 8: ...Condenser Fan Relays Capacitor CAB Relay CAB Disconnect Switch Opt Defrost Control KD only Fan Control Board KD only Proper Gas Flow Approximate 1 Operate unit at least 15 minutes before checking gas...

Отзывы: