background image

Page 4

Model Number Identification 

Unit Type

CB - Air Handler

Series

Nominal Cooling Capacity

018 = 1.5 tons
024 = 2 tons
030 = 2.5 tons
036 = 3 tons
042 = 3.5 tons
048 = 4 tons
060 = 5 tons

Configuration

UH = Up-Flow / Horizontal

CB X 25 UH − 030 − 230 − 10

Refrigerant Type

X = HFC-410A

Minor Revision Number

Voltage

230 = 208/230V-1 phase-60hz

Blower Data 

The cooling blower speed is factory configured to provide
correct airflow for an outdoor unit that matches the cooling
capacity rating of the air handler.

CHANGE BLOWER SPEED

If the outdoor unit is smaller than the maximum cooling
capacity rating for the air handler, the cooling blower speed
may need to be changed. Refer to blower performance
chart, table 1 on page 5. Use figure 1 on page 4 as a
illustrated guide to the following procedure:

1. Disconnect all power supplies.
2. Remove the air handler access panel.
3. A blower relay harness is used to connect blower relay

terminals 

2

 and 

5

. The third connector is mated to the

BLUE (MED)

 wire.

4. Disconnect the 

BLUE (MED)

 wire connection.

5. Determine the required blower speed and connect

either the blower lead 

RED (LO)

 or 

BLACK (HI) 

to

the

 

blower relay harness.

NOTE — Reuse the factory-installed plastic cap on the
connector that is not used.

6. Replace all panels.
7. Reconnect power.

CAUTION

Electrostatic discharge can affect electronic compo­
nents. Take precautions during unit installation and
service to protect the unit's electronic controls. Pre­
cautions will help to avoid control exposure to electro­
static discharge by putting the unit, the control and
the technician at the same electrostatic potential.
Neutralize electrostatic charge by touching hand and
all tools on an unpainted unit surface before perform­
ing any service procedure.

2

BLUE (MED)

RED (L0)

BLACK (HI)

YELLOW (COM)

5

BLOWER RELAY

BLOWER RELAY

PLASTIC CAPS

4-PIN

BLOWER CONNECTOR

HARNESS

Figure 1. Changing Blower Speed

NOTE — Refer to wiring diagram  located on the unit access panel (or figure 1 above) and blower performance (table 1).

S

All air data measured external to unit with 1 inch non-pleated air filter in place.

S

All factory settings are medium speed except the -48 which is set to low speed from the factory.

S

All data given while air handler is operating with a dry DX coil.

Содержание CBX25UH 10 Series

Страница 1: ...ections 16 Wiring Diagrams 18 Start Up Operations 20 Sequence of Operations 21 Performance Checklists 22 The CBX25UH units are high efficiency air handlers Several models are available in sizes rangin...

Страница 2: ...nches mm NOTE Unit is shipped configured for horizontal left hand air discharge Unit may be converted to horizontal right hand air discharge by repositioning horizontal drain pan Dimensions remain the...

Страница 3: ...ly 2 0 2 0 2 4 2 5 Blower Motor Full Load Amps 1 6 1 6 1 9 2 0 SPECIFICATIONS General Data Model Number CBX25UH 042 CBX25UH 048 CBX25UH 060 Nominal tonnage 3 5 4 5 Connections Suction Vapor line o d i...

Страница 4: ...ion 5 Determine the required blower speed and connect either the blower lead RED LO or BLACK HI to the blower relay harness NOTE Reuse the factory installed plastic cap on the connector that is not us...

Страница 5: ...1970 1645 1800 1850 1565 1685 1719 1470 1560 1595 60 Low Red Med Blue High Black 1675 1965 2140 1630 1925 2085 1580 1875 2000 1520 1800 1895 1450 1695 1795 NOTE Refer to wiring diagram located on the...

Страница 6: ...of normally open N O contacts closes to energize the blower motor on cooling speed When de energized a set of normally closed N C contacts allows the electric heat relay to energize the blower on hea...

Страница 7: ...n the air handler unit before setting the air handler unit and attaching the plenum 1 Shut off all power to the air handler unit More than one disconnect may be required 2 Remove air handler access pa...

Страница 8: ...ischarge which will require no change in the circuit breaker orientation However if the air handler is installed in a horizontal right hand discharge position the breaker will need to be rotated 180 s...

Страница 9: ...the National Electric Code ANSI NFPA No 70 or tables 1 through 4 in the Canadian Electric Code Part I CSA Standard C22 1 Refer to figure 28 for typical low voltage field wiring for air handler conden...

Страница 10: ...c air handler installation instructions for air handler speed adjustment procedure and location 1 Set the thermostat above room temperature 2 Check the heat pump and the heat section for normal operat...

Страница 11: ...ch plugs are required for drain line connections 2 With access door removed remove drain line plugs to install drain lines 3 Set unit so that it is sloped toward the drain pan end of the unit see figu...

Страница 12: ...n 180 and reinstall on coil as shown by the arrow above Reinstall the top cap Rotate the blow off prevention brackets 180 and reinstall using the same screws Use the correct mounting holes the bracket...

Страница 13: ...stall the brackets that hold the coil and horizontal drain pan in place See figure 23 Figure 23 Reinstall Brackets that Hold the Coil and Horizontal Drain Pan in Place 8 Reinstall the blower and coil...

Страница 14: ...INISHED SPACE THE SECONDARY DRAIN PAN MUST HAVE A LARGER FOOTPRINT THAN THE AIR HANDLER MAIN DRAIN TO APPROVED DRAIN FOR NEGATIVE PRESSURE COILS BLOWER AFTER COIL TRAPS ARE REQUIRED ON ALL DRAIN LINES...

Страница 15: ...no leaks are found in drain line fittings and water is draining from the end of the primary drain line 3 Correct any leaks found DUCT SYSTEM The air handler is provided with flanges for the connection...

Страница 16: ...g Failure to do so can result in death or elec trical shock WARNING Electric Shock Hazard Can cause injury or death Foil faced insulation has conductive characteristics sim ilar to metal Be sure there...

Страница 17: ...pplies 2 Remove the air handler access panel 3 Using the wiring diagram located on the unit access panel as a reference move the 2 connected black transformer leads from the 240 volt terminal on the t...

Страница 18: ...AT HEAT PUMP APPLICATION WITH ELECTRIC HEAT NOTE Connect common wire only if required Refer to the appropriate thermostat installation instructions BU BU SEE NOTE SEE NOTE SEE NOTE Y Y AIR CONDITIONER...

Страница 19: ...K CONNECT COMMON WIRE ONLY IF REQUIRED REFER TO THE APPROPRIATE THERMOSTAT INSTALLATION INSTRUCTIONS CONDENSING UNIT Air Handler AIR HANDLER THERMOSTAT Heat Pump Application With Electric Heat AIR HAN...

Страница 20: ...finished ceiling or in any installation where condensate overflow could cause damage S Have ALL unused drain pan ports been properly plugged S Has the condensate line been properly sized run trapped p...

Страница 21: ...g demand the indoor blower and outdoor unit should cycle off Air handler should cycle off 45 seconds after the outdoor unit shuts off HEATING ELECTRIC HEAT ONLY When the thermostat calls for heat the...

Страница 22: ...Mode Return Duct Temperature ___________ THERMOSTAT Adjusted and Programmed Return External Static ______ ______ Total External Static ______ ______ 6 Supply Duct Temperature ___________ Temperature...

Страница 23: ...ternal Static ______ ______ 6 6 Supply Duct Temperature ___________ Temperature Drop ___________ TEMPERATURE RISE Heating Mode Return Duct Temperature __________ Supply Duct Temperature __________ Tem...

Отзывы: