Page 34
B-ECB29‐2.5, -4, ‐5, -6, 4CB, 5CB, 6CB - 208/230V SINGLE PHASE -
SEQUENCE OF OPERATION
1- When there is a call for heat, W1 of the thermostat ener
gizes the electric heat relay K35 with 24VAC.
2- When K35‐1 closes, the blower is energized on heat
ing speed.
3- Assuming the N.C. primary (S15) and secondary (S20)
limit switches are closed, electric heat element HE1 is en
ergized.
Содержание CBA27UHE-018
Страница 11: ...Page 11 FIGURE 6 ECB29 8 8CB 9CB 10 10CB 208 230 SINGLE PHASE ELECTRIC HEAT VESTIBULE PARTS ARRANGEMENT...
Страница 12: ...Page 12 FIGURE 7 ECB29 12 5CB 15CB 208 230 SINGLE PHASE ELECTRIC HEAT VESTIBULE PARTS ARRANGEMENT...
Страница 14: ...Page 14 FIGURE 9 ECB29 20CB 208 230 SINGLE PHASE ELECTRIC HEAT VESTIBULE PARTS ARRANGEMENT...
Страница 15: ...Page 15 FIGURE 10 ECB29 25CB 30CB 208 230 SINGLE PHASE ELECTRIC HEAT VESTIBULE PARTS ARRANGEMENT...
Страница 16: ...Page 16 FIGURE 11 ECB29 20CB 25CB 208 230 THREE PHASE ELECTRIC HEAT VESTIBULE PARTS ARRANGEMENT...
Страница 33: ...Page 33 460V Single Phase...