Page 23
TABLE 2
TB1 TERMINAL DESIGNATIONS
Y1
Cool Stage 1
Y2
Cool Stage 2
Y3
Cool Stage 3 (N/A)
Y4
Cool Stage 4 (N/A)
W1
Heat Stage 1
W2
Heat Stage 2
A1
Occupied Loop
A2
Occupied Loop
G
Indoor Blower
R
24V To Thermostat
C
Ground
TEST
Test Terminal (Disable Min Run Time)
TABLE 3
TB14 24VAC TERMINAL DESIGNATIONS
24VAC
Uninterrupted 24 Volt Power
R
24 Volt Accessories (from T1 transformer)
T18
24 Volts (from T18 transformer)
C
Ground
TABLE 4
P142 TERMINAL DESIGNATIONS
Terminal
Function
Y2
From Economizer (cool2)
Y2E
To Processor (micro chip)
Y1
From Economizer
Y1E
To Processor (micro chip)
24V
To Smoke Detector
24V
From T1 Transformer
A2
Occupied Loop from Thermostat
R
To Economizer
C
Ground to Economizer
R
From Transformer T1
C
Ground
K3
From Transformer T18
Y3
To Processor (micro chip)
TABLE 5
P113 TERMINAL DESIGNATIONS
Terminal
Function
S49
Relay KA To Freeze Stat
S49
From Freeze Stat
K10
Relay KA To Outdoor Fan Relay
K1
Freeze Stat to Compressor Contactor
S50
Relay KB To Freeze Stat
S50
From Freeze Stat
K2
Freeze Stat To Compressor Contactor
K3
KD To Fan Relay
C
Ground To Cooling Component
TABLE 6
P88 TERMINAL DESIGNATIONS
Terminal
Function
R
24V To A3
W1
Heat Stage 1 to A3
Y1
Cooling Stage to A3
C
Ground to A3
G
Blower Demand to A3
BL OUT
Blower Out from A3
W2
Heat Stage 2 to A3
TABLE 7
P118 TERMINAL DESIGNATIONS
Terminal
Function
S53
Relay KC to Freezestat
S53
From Freezestat
K68
Relay KD to Outdoor Fan Relay
K14
Freezestat to Compressor Contactor
S95
Relay KC to Freezestat
S95
From Freezestat
K146
Freezestat to Compressor Contactor
Y4
Cool Stage 4 from TB1
C
Ground
C
Ground
T18
24V from T18
C
Ground