Pre commissioning action
Smart Energy Company
www.systemapolska.pl
Make sure the gas in the mains corresponds to that for which
EOLO LX is regulated – Gas pressure & type comply with the
data on name plate
Check, with the pressure intake "IN" on the gas valve, that
pressure entering the valve corresponds to that required for
the type of gas being used.
Purge the gas pipe
Check tightness of gas system
Check Correctness of electrical connection / Voltage value,
Check that efficient earthing connections have been completed,
carried out as specified by current safety regulations
Tabele 5.1, page 44
Содержание 70LENX1000
Страница 9: ...Burner units model E Baltic C D E box Smart Energy Company www systemapolska pl ...
Страница 10: ...Burner units model E Baltic F G H box Smart Energy Company www systemapolska pl ...
Страница 31: ...Heat exchanger gas unit Main board operation ...
Страница 49: ...Smart Energy Company www systemapolska pl Commissioning procedure start up ...
Страница 56: ...HEGU procedure to put in Hi Lo power Smart Energy Company www systemapolska pl ...
Страница 58: ...Supply pressure in countries Smart Energy Company www systemapolska pl Tabele 5 1 page 44 ...
Страница 61: ...Gas valve calibration Smart Energy Company www systemapolska pl Based on E Baltic C box IOM page 62 ...
Страница 67: ...Burner electrode change in module C D E E Smart Energy Company www systemapolska pl From serial no L21G11320 ...
Страница 74: ...Heat exchanger gas unit Troubleshooting Smart Energy Company www systemapolska pl ...
Страница 97: ...Smart Energy Company www systemapolska pl THANK YOU FOR ATTENTION ...