506470-01
Issue 1007
Start-Up and Performance Checklist
Job Name _____________________________
Job No. ____________
Date ___________
Job Location ___________________________
City _______________
State ___________
Installer _______________________________
City _______________
State ___________
Unit Model No. _________________________
Serial No._____________________________
Service Technician _______________________
Nameplate Voltage _____________________
Rated Load Ampacity _________ Compressor Amperage ________
Outdoor Fan __________
Maximum Fuse or Circuit Breaker ________________________
Electical Connections Tight? Indoor Filter Clean? Supply Voltage (Unit Off) __________
Indoor Blower RPM ___________________ S.P. Drop Over Indoor (Dry) ____________________
Outdoor Coil Entering Air Temperature ________ Voltage with Compressor Operating __________
Outdoor Fan Checked?
Cooling
Liquid Line Pressure _______ Suction Line Pressure _______ Refrigerant Charge Checked?
Heating
Liquid Line Pressure _______ Suction Line Pressure _______ Refrigerant Charge Checked?
Refrigerant Lines: Leak Checked? Properly Insulated?
Service Valves: Fully Opened? Caps Tight?
Thermostat: Calibrated? Properly Set? Level?
Sequence of Operation
Heating Correct? Cooling Correct?
Page 26
Содержание 4HP18LT
Страница 28: ...506470 01 Issue 1007 Page 28 NOTES...