background image

Page 1

508038-01 

12/2019

INSTALLATION INSTRUCTION FOR SURELIGHT IGNITION CONTROL REPLACEMENT KIT (19V36)

SURELIGHT IGNITION CONTROL 

REPLACEMENT KIT

GAS UNITS

KITS & ACCESSORIES

Shipping and Packing List

Package 1 of 1 contains:

1 - Replacement ignition control
1 - Wiring harness (9-pin to 12-pin)
1 - Wiring harness (4-pin to 6-pin)
2 - Ignitor mounting brackets
1 - Replacement ignitor
1 - Ignitor harness adapter
1 - Diagnostic sticker
2 - Screws
3 - Wire nuts
1 - Wire
1 - Wiring diagram

Shipping Damage

Check all equipment for shipping damage. If you find any 

damaged equipment, immediately contact the last carrier.

Application

This kit contains all components required to replace any 

existing single-stage SureLight

®

 ignition control in a Len-

nox gas furnace.

Installation

 WARNING

I

mproper installation, adjustment, alteration, 

service or maintenance can cause property damage, 

personal injury or loss of life. Installation and service 

must be performed by a licensed professional HVAC 

installer or equivalent, service agency, or the gas 

supplier

 CAUTION

As with any mechanical equipment, contact with 

sharp sheet metal edges can result in personal 

injury. Take care while handling this equipment and 

wear gloves and protective clothing.

 WARNING

Disconnect power before servicing unit.

ELECTROSTATIC DISCHARGE (ESD)

Precautions and Procedures

 CAUTION

Electrostatic discharge can affect electronic 

components. Take precautions to neutralize 

electrostatic charge by touching your hand 

and tools to metal prior to handling the 

control.

Replacing 69M0801, 32M8801, 10M9301, 56L8401 or 

12L6901

1 - 

 Disconnect electrical power and shut off gas supply 

to the furnace.

2 -   Remove the access panel.
3 -   Label and disconnect wiring and remove existing 

ignition control from the control box.

4 -   

Position the provided replacement ignition 

control over the holes marked “A” in Figure 1 for 

the appropriate control box design. Snap the 

replacement ignition control into place in the control 

box. 80UHG – the control mounting panel will be 

rotated 90° from either position shown in Figure 1.

5 -   Insert the provided 6” loose white wire into position 

2 on the 12-pin connector, and then splice to the 

white/red  flame  sense  wire  in  the  furnace.  Cut 

wire terminal, strip wires, and join with wire nut 

as  appropriate.  Refer  to  figure  2  for  pin  location. 

Connect 12-pin connector to the replacement 

control.

6 -   Connect the remaining 120VAC hot and neutral 

wires and thermostat wires to the replacement 

control per table 1.

7 - 

 Affix  wiring  diagram  5380770-01  on  top  of  the 

existing unit wiring diagram. Affix diagnostic sticker 

to an appropriate location.

©

2019 

Lennox Industries Inc.

 

Отзывы: