Page 4
Requirements
These units must be installed in accordance with all
applicable national and local safety codes.
These instructions are intended as a general guide and do
not supersede local codes in any way. Consult authorities
having jurisdiction before installation.
If components are to be added to a unit to meet local codes,
they are to be installed at the dealer’s and/or customer’s
expense.
These units are design listed by UL in both the United
States and Canada as follows:
For use as a cooling unit.
For outdoor installation only.
For installation on combustible material.
WARNING
Product contains fiberglass wool.
Disturbing the insulation in this product during
installation, maintenance, or repair will expose you
to fiberglass wool dust. Breathing this may cause
lung cancer. (Fiberglass wool is known to the State
of California to cause cancer.)
Fiberglass wool may also cause respiratory, skin,
and eye irritation.
To reduce exposure to this substance or for further
information, consult material safety data sheets
available from address shown below, or contact your
supervisor.
Lennox Industries Inc.
P.O. Box 799900
Dallas, TX 75379−9900
Location Selection
Use the following guidelines to select a suitable location for
these units.
1 − Unit is designed for outdoor installation only. Unit must
be installed so all electrical components are protected
from water.
2 − Condenser coils must have an unlimited supply of air.
3 − For ground level installation, use a level pre−fabricated
pad or use a level concrete slab with a minimum thick-
ness of 4 inches. The length and width should be at
least 6 inches greater than the unit base. Do not tie the
slab to the building foundation.
4 − Maintain level within a tolerance of 1/4 inch maximum
across the entire length or width of the unit.
Rigging & Setting Unit
Exercise care when moving the unit. Do not remove any
packaging until the unit is near the place of installation. An
optional lifting lug kit (92M51) may be purchased
separately for use in rigging the unit for lifting. Spreaders
MUST be used across the top of the unit. Recommended
spreader length: 2, 2−1/2, 3−ton units −− 44"; 3−1/2, 4, 5−ton
units −− 54".
Figure 1
Accessory Lift Kit
Lifting Bracket
Accessory
Sheet Metal
Screw
CAUTION
Before lifting a unit, make sure that the weight is dis-
tributed equally on the cables so that it will lift evenly.
Units may also be moved or lifted with a forklift while still in
the factory supplied packaging.
NOTE − Length of forks must be a minimum of 42 inches.
Clearances
All units require certain clearances for proper operation
and service. Refer to figure 2 for the clearances required
for combustible construction, servicing, and proper unit
operation.