Lennox Hearth Products Adagio ADAGIO-EN Скачать руководство пользователя страница 4

4

NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

     WARNING 

Failure to comply with the instal-

lation and operating instructions 

provided in this document will 

result in an improperly installed 

and operating appliance, voiding 

its warranty.  Any change to this 

appliance  and/or  its  operating 

controls is dangerous.  Improper 

installation or use of this appli-

ance can cause serious injury or 

death from fire, burns, explosion 

or carbon monoxide poisoning.

       WARNING 

Children  and  adults  should  be 

alerted  to  the  hazards  of  high 

surface temperatures and should 

stay away to avoid burns or cloth-

ing ignition. Use caution around 

the appliance to avoid burns or 

clothing ignition. Young children 

should be carefully supervised 

when they are in the same room 

as the appliance.

Note:  An  Optional  Screen  Door 

or Screen Panel  for the glass is 

available (see  Care and Opera-

tions Manual for ordering infor-

mation).

       WARNING 

Do  not  place  clothing  or  other 

flammable materials on or near 

this appliance.

       

AVERTISSEMENT

Surveiller les enfants.  Garder les 

vêtements, les meubles, l'essence 

ou autres liquides à  vapeur inflam-

mables lin de l'appareil.

REQUIREMENTS  FOR  THE  COMMON-
WEALTH OF MASSACHUSETTS

Note:

 The following requirements reference 

various  Massachusetts  and  national  codes 

not contained in this document.

For all side wall horizontally vented gas fueled 

equipment installed in every dwelling, build-

ing or structure used in whole or in part for 

residential purposes, including those owned 

or operated by the Commonwealth and where 

the side wall exhaust vent termination is less 

than seven (7) feet above finished grade in the 

area of the venting, including but not limited to 

decks and porches, the following requirements 

shall be satisfied: 

Installation Of Carbon Monoxide Detectors 

At  the  time  of  installation  of  the  side  wall 

horizontal  vented  gas  fueled  equipment,  the 

installing  plumber  or  gasfitter  shall  observe 

that a hard wired carbon monoxide detector 

with an alarm and battery back-up is installed 

on the floor level where the gas equipment is to 

be installed. In addition, the installing plumber 

or gasfitter shall observe that a battery operated 

or hard wired carbon monoxide detector with 

an alarm is installed on each additional level 

of the dwelling, building or structure served 

by the side wall horizontal vented gas fueled 

equipment. It shall be the responsibility of the 

property owner to secure the services of quali-

fied licensed professionals for the installation of 

hard wired carbon monoxide detectors.

In  the  event  that  the  side  wall  horizontally 

vented gas fueled equipment is installed in a 

crawl space or an attic, the hard wired carbon 

monoxide  detector  with  alarm  and  battery 

back-up may be installed on the next adjacent 

floor level.

 In the event that the requirements of this subdi-

vision can not be met at the time of completion 

of installation, the owner shall have a period 

of thirty (30) days to comply with the above 

requirements; provided, however, that during 

said thirty (30) day period, a battery operated 

carbon monoxide detector with an alarm shall 

be installed.

Approved Carbon Monoxide Detectors

Each  carbon  monoxide  detector  as  required 

in accordance with the above provisions shall 

comply with NFPA 720 and be ANSI/UL 2034 

listed and IAS certified.

Signage

A metal or plastic identification plate shall be 

permanently  mounted  to  the  exterior  of  the 

building at a minimum height of eight (8) feet 

above grade directly in line with the exhaust vent 

terminal for the horizontally vented gas fueled 

heating appliance or equipment. The sign shall 

read, in print size no less than one-half (1/2) 

inch in size, 

“GAS VENT DIRECTLY BELOW. 

KEEP CLEAR OF ALL OBSTRUCTIONS.”

Inspection

The  state  or  local  gas  inspector  of  the  side 

wall horizontally vented gas fueled equipment 

shall not approve the installation unless, upon 

inspection,  the  inspector  observes  carbon 

monoxide  detectors  and  signage  installed  in 

accordance  with the provisions  of 248 CMR 

5.08(2)(a)1 through 4.

Exemptions

The  following  equipment  is  exempt  from  248 

CMR 5.08(2)(a)1 through 4:

•  The equipment listed in Chapter 10 entitled 

“Equipment  Not  Required  To  Be  Vented” 

in the most current edition of NFPA 54 as 

adopted by the Board; and

•  Product  Approved  side  wall  horizontally 

vented gas fueled equipment installed in a 

room or structure separate from the dwell-

ing, building or structure used in whole or 

in part for residential purposes.

MANUFACTURER REQUIREMENTS

Gas Equipment Venting System Provided

When the manufacturer of Product Approved 

side  wall  horizontally  vented  gas  equipment 

provides a venting system design or venting 

system components with the equipment, the 

instructions provided by the manufacturer for 

installation of the equipment and the venting 

system shall include:

•  Detailed instructions for the installation of 

the  venting  system  design  or  the venting 

system components; and 

•  A complete parts list for the venting system 

design or venting system.

Gas  Equipment  Venting  System  NOT  Pro-

vided

When the manufacturer of a Product Approved 

side wall horizontally vented gas fueled equip-

ment  does  not  provide  the  parts  for  venting 

the flue gases, but identifies “special venting 

systems”, the following requirements shall be 

satisfied by the manufacturer:

•  The  referenced  “special  venting  system” 

instructions shall be included with the appli-

ance or equipment installation instructions; 

and 

•  The  “special  venting  systems”  shall  be 

Product  Approved  by  the  Board,  and  the 

instructions for that system shall include a 

parts list and detailed installation instruc-

tions.

A  copy  of  all  installation  instructions  for  all 

Product Approved side wall horizontally vented 

gas fueled equipment, all venting instructions, 

all parts lists for venting instructions, and/or all 

venting design instructions shall remain with 

the appliance or equipment at the completion 

of the installation.

•  Installation and repair must be done by a 

plumber or gas fitter licensed in the Com-

monwealth of Massachusetts.

•  The flexible gas line connector used shall 

not exceed 36 inches (92 centimeters) in 

length.

•  The individual manual shut-off must be a 

T-handle type valve.

NEW YORK CITY, NEW YORK (MEA)

Installation  of  these  fireplaces  are  approved 

for installation in New York City in the US state 

of New York.

Содержание Adagio ADAGIO-EN

Страница 1: ...rating plate This appliance is not convertible for use with other gases unless a certified kit is used Adagio Series US P N 850 044M Rev D 06 2008 In the Commonwealth of Massachusetts Installation must be performed by a licensed plumber or gas fitter See Table of Contents for location of additional Commonwealth of Massachusetts requirements Millivolt Models Electronic Model ADAGIO MN ADAGIO EN ADA...

Страница 2: ...iances Millivolt appliances are designed to operate on natural or propane gas A millivolt gas control valve with piezo ignition system provides safe efficient operation External electrical power is required to operate the optional blower if installed in these units Electronicappliancesaredesignedtooperateon natural or propane gas An electronic intermit tent pilot ignition system provides safe effi...

Страница 3: ...ea Level To High Altitude All Models These appliances are tested and approved for installationatelevationsof0 4500feet 0 1372 meters above sea level using the standard burner orifice See Table 5 For elevations above 4500 feet contact your gas supplier or qualified service technician Install the appliance according to the regulations of the local authorities having jurisdiction and in the USA the N...

Страница 4: ...or with an alarm shall be installed Approved Carbon Monoxide Detectors Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI UL 2034 listed and IAS certified Signage A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight 8 feet abovegradedirectlyinlinewithth...

Страница 5: ...2 1 latest edition MANUFACTURED HOME REQUIREMENTS This appliance may be installed in an after market permanently located manufactured home USA only or mobile home where not prohibited by local codes Cet appareil peut être installé dans un maison préfabriquée É U seulement ou mobile déjà installée à demeure si les réglements locaux le permettent Manufactured Home installations must be installed in ...

Страница 6: ... Degree Elbow Secure Vent Secure Flex flex elbow 52 1321 53 3 4 1365 Includes 4 clearance to combustibles required above vent components MINIMUM CLEARANCES Inches millimeters Back 1 2 in 13 mm Sides 1 2 in 13 mm Top Spacers 0 in 0 mm Floor 0 in 0 mm FromBottomofUnit To Ceiling 64 in 1626 mm Vent 3 76 Top 1 25 4 Sides Bottom SERVICE CLEARANCES Feet meters Front 3 feet 0 9 meters Table 6 Do not insu...

Страница 7: ... 91 cm 3 feet 91 cm J Clearance to non mechanical air supply inlet to building or the combustion air inlet to any other appliance 6 in 15 2 cm for appliances 10 000 BTU hr 3kW 12 in 30 cm for appliances 10 000 BTU hr 3kW and 100 000 BTU hr 30kW 36 inches 91 cm for appliances 100 000 BTU hr 30kW 6 in 15 2 cm for appliances 10 000 BTU hr 3kW 9 in 23 cm for appliances 10 000 BTU hr 3kW and 50 000BTU ...

Страница 8: ... according to local codes these instructions the current National Fuel Gas Code ANSI Z223 1 in the USA or the current standards of CAN CGA B149 1 and B149 2 in Canada Horizontal Vent Termination Clearances The horizontal vent termination must have a minimum of 3 76 mm clearance to any overhead combustible projection of 2 1 2 64 mm or less See Figure 7 For projections exceeding 2 1 2 64 mm see Figu...

Страница 9: ...ed in Figure 9 unless the appliance is to be installed in a corner See Figure 10 for corner framing installations All framing details must allow for a minimum clearance to combustible framing members as shown in Table 6 on Page 6 If the appliance is to be elevated above floor level a solid continuous platform must be constructed Headers may be in direct contact with the appliance top spacers but m...

Страница 10: ...2 191 Outer 36 23 32 933 21 1 16 535 1 7 8 48 6 1 16 154 8 7 32 209 1 1 2 38 15 1 32 382 15 15 32 393 7 11 16 195 34 864 40 1 32 1017 20 3 4 527 14 3 4 375 5 13 32 137 Due to Lennox ongoing commitment to quality all specifications ratings and dimensions are subject to change without notice Figure 11A FIREPLACE specifications ...

Страница 11: ...ice With the facade installed required sold separately the appliance base will need to be elevated a minimum of 3 4 above the floor to allow for the proper fit of the facade i e use 3 4 board minimum as platform Figure 11B FACADE specifications Facade Required arched style shown 26 3 4 680 38 1 2 978 20 1 4 514 14 13 16 376 1 2 13 1 2 13mm 1 1 2 38mm Arch Facades Black and Brushed Nickel Finishes ...

Страница 12: ...cation The following sections describe vertical roof and horizontal exterior wall vent applications Refer to the section relating to your installation A list of approved venting components are shown in the tables on Page 30 Vertical Termination Systems Roof Figures 17 and 23 through 25 on Pages 14 and 16 and their associated Vertical VentTablesillustratethevariousverticalventing configurations tha...

Страница 13: ...1 2 0 0 3 7 5 5 7 4 0 0 1 1 0 2 6 6 5 2 5 0 2 2 0 0 4 5 7 6 5 2 6 5 0 0 3 0 0 3 9 6 5 7 5 0 0 0 2 0 2 2 7 6 1 0 3 0 0 4 5 3 7 5 2 1 6 1 0 0 2 0 3 5 9 7 5 2 6 6 0 1 0 2 0 3 1 8 5 7 6 0 0 0 1 1 2 0 9 5 7 0 2 1 0 1 4 5 1 9 5 2 6 7 0 0 2 0 1 3 3 9 5 7 7 0 0 0 0 2 2 6 9 8 1 0 1 2 0 4 5 7 9 5 2 1 8 1 0 0 0 2 3 2 0 1 5 8 2 0 0 0 2 4 5 3 0 1 5 2 6 8 0 0 0 3 0 3 8 0 1 9 1 0 0 3 0 4 4 1 1 5 9 0 2 0 0 2 4 7 ...

Страница 14: ...gthedimplesdown and along the incline channels until they seat at the end of the channels This seating position is indicated by the alignment of the arrow and dimple as shown in Figure 16 D Install firestop spacer at ceiling When usingSecureVent useSV4 5VFfirestop spacer at ceiling joists when using Secure Flex use SF4 5VF firestop spacer If there is living space above the ceiling level the firest...

Страница 15: ...Page 7 The SV4 5CGV 1 Vertical Termination Figure 22 installs in the exact same fashion as any other Secure Vent section Align the termination over the end of the previously installed section adjusting the radial alignment until the four locking dimples of the termination are aligned with the inlets of thefourinclinechannelsofthelastventsection Pushtheterminationdownuntilitfullyengages thentwistth...

Страница 16: ...acer SF4 5VF uCeiling Firestop Spacer SV4 5VF uCeiling Firestop Spacer SV4 5VF vWall Firestop Spacer SV4 5HF uWhen using Secure Flex use Firestop Spacer SF4 5VF vWhen using Secure Flex use Firestop Spacer SF4 5HF WARNING UnderNoCircumstances MaySepa rate Sections of Concentric Flexible Vent Pipe Be Joined Together V H1 H V1 uCeiling Firestop Spacer SV4 5VF vWall Firestop Spacer SV4 5HF Example If ...

Страница 17: ...on lengths are available Plan the vent lengths so that a joint does not occur at the intersection of ceiling or roof joists Make allowances for elbows as indicated in Figure 18 on Page 14 Maintain a minimum 1 25 mm clearance to combustibles on the vertical sections Clear ances for the horizontal runs are 3 76 mm on top 1 25 mm on sides and 1 25 mm at the bottom B Frame exterior wall opening Locate...

Страница 18: ...m at all sides for all vertical runs and 3 76 mm at the top 1 25 mm at sides and 1 25 mm at the bottom for all horizontal inclined runs J Assemble vent run to exterior wall If not previously measured locate the center of the vent at the exterior wall Prepare an opening as describedinStepB Assembletheventsystem to point where the terminus of the last section is within 6 in 152 mm to 9 1 4 in 235 mm...

Страница 19: ... show a 1 V to 5 H ratio up to a maximum horizontal run of 20 feet except for installations where an elbow is the only vertical vent section in the system see Figure 29 AN ELBOW IS ACCEPTABLE AS 1 FOOT OF VERTICAL RISE EXCEPT WHERE AN ELBOW IS THE ONLY VERTICAL COMPONENT IN THE SYSTEM See Figure 29 See Table 7 as an aid in venting component selection for a particular range of exterior wall thickne...

Страница 20: ...al run of 20 feet An elbow is acceptable as 1 foot of vertical rise except where an elbow is the only vertical component in the system See Figure 29 V H H1 V1 Wall Firestop Spacer SV4 5HF Ceiling Firestop Spacer SV4 5VF When using Secure Flex use Firestop Spacer SF4 5VF When using Secure Flex use Firestop Spacer SF4 5HF Wall Firestop Spacer SV4 5HF Example If 20 feet total H H1 horizontal vent run...

Страница 21: ...vent pipe push it back out of the way 2 ApplyabeadofMill PacBlack 700 F high temperature sealant Catalog No 10K81 to the inner adapter collar approximately 1 2 inch from the end 3 Pull and extend the inner flexible vent pipe 4 Slidetheinnerflexpipeovertheadaptercol lar Ensure the flexible vent pipe completely engages the adapter collar to a distance of 1 3 4 inches from the end and that it is free...

Страница 22: ...ure 11A on Page 10 3 Remove the cover plate s knockout and then feedthepowersupplywirethroughtheknock out opening and into the unit junction box 4 Connect the black power supply wire to the red pigtail lead and the white power supply wire to the common terminal of the outlet as shown in Figures 36 and 37 5 Connect the ground supply wire to the pig tail lead attached to outlet s green ground screw ...

Страница 23: ...by striking or slamming it Handle this glass with extreme care Glass is susceptible to damage Do not scratch or handle roughly while reinstalling the glass door frame BLOWER CONTROL CIRCUIT WIRING 120V 60HZ 1PH Factory Wired Ground Field Wired Junction Box Tab Intact Tab Broken Plug blower into this receptacle n e e r G d n u o r G Wall mounted ON OFF Blower Switch or Variable Speed Control Switch...

Страница 24: ...k for leaks Turn on gas supply and test for gas leaks using a gas leak test solution also referred to as bubble leaksolution Note Usingasoapywatersolution 50 dish soap 50 water is an effective leak test solution but it is not recommended because the soap residue that is left on the pipes fittings can result in corrosion over time Gas Valve 3 8 NPT x Flare Fitting 3 8 Flex Tubing 3 8 Nipple 3 8 Uni...

Страница 25: ...enter to provide a natural fire look WARNING DO NOT attempt to install the logs until the appliance installation has been completed the gas line connected and tested for leaks and the initial burner operation has been checked out Logs get very hot and will remain hot up to one hour after gas supply is turned off Handle only when logs are cool Turn off all electricity to the appliance before you in...

Страница 26: ...ion the hole on the bottom of log D over pin 3 4 Place the right front log E as shown in Figure 45 Position the hole on the bottom of log E over pins 4 and 5 6 Ember Placement Separate the Embers rockwool into pieces about the size of a quarter see Figure 41 Keep the pieces fluffed up not matted Distribute these pieces over the surface of the burner as shown in Figure 47 Do not use more than is ne...

Страница 27: ... Nozzels Figure 49 Figure 48 MILLIVOLT Thermocouple Hood Igniter Rod 3 8 Min 9 mm Thermopile Pilot Nozzels Step 10 Checking Appliance Opera tion With gas line installed run initial system check outbeforeclosingupthefrontoftheunit Follow the pilot lighting instructions provided in the Care and Operation Manual For piezo igniter location see Figure 39 on Page 24 millivolt appliances only Note Lighti...

Страница 28: ... switch in the OFF position Close the lower control compartment panel Note See Figure 50 for proper burner flame appearance Air Shutter Adjustment Guidelines If there is smoke or soot present first check the log set positioning to ensure that the flames are not impinging on any of the logs If the log set is properly positioned and a sooting condition still exists then the air shutter opening shoul...

Страница 29: ...ion Ahearthextensionisnotrequiredwiththisappliance Ifahearthextension is used do not block the lower control compartment panel Any hearth extension used is for appearance only and does not have to conform to standard hearth extension installation requirements Note Combustible wall finish materials and or surround materials must not be allowed to encroach the area defined by the appliance front fac...

Страница 30: ...nt Sections ListedSecureVentComponents Cat No Model Description These termination kits include firestop spacer gear clamps and flex adapter H1969 SF4 5HT 2 HorizontalSquareTermina tion withoutflex 77L87 SFKIT12S FlexSquareTerm with 12inch 305mm compressedflex 77L88 SFKIT18S FlexSquareTerm with 18inch 457mm compressedflex 77L89 SFKIT24S FlexSquareTerm with 24inch 610mm compressedflex 77L90 SFKIT36S...

Страница 31: ...nsdufabricantettoutesexigences et codes applicables de l autorisés avoir la juridiction Si l information danscetteinstructionn estpassuivie exactement unfeu explosionoupro ductiondeprotoxydedecarbonepeut résulterledommagescauserdepro priété perteoublessurepersonnelle devie L agencequalifiéedeservice estesponsabledel installationpropre de cet équipment L installation n est pas propre et compléte ju...

Страница 32: ...e orifice B Retrieve the burner and slide the venturi tube over the orifice see Figure 53 Set the burner assembly into its position and secure it Figure 56 Burner Orifice Step8 Reassembletheremainingcomponents by reversing the procedures outlined in the preceding steps Use pipe joint compound or Teflon tape on all pipe fittings before installing ensurepropaneresistantcompoundsareused in propane ap...

Отзывы: