background image

Figure 11

 Insulated Chase Construction

7 Ft. 

Min.

Attic 

Radiation

Shield

Roof Support

Storm 

Collar

Flashing

Drywall or 

Any Rigid 

Material 

2” x 4”

1/2” Plywood

6’ 8” 

Min.

Firestop

* Floor 

Ceiling

Wall

* Floor 

Ceiling

Wall

Fireplace

Insulate Joists

Same As Ceiling

Draft Stops

Firestop

CTDT

Termination

Note: Non-

Combustible

Chase

Flashing

Must Be

Used To

Cover

Chase

Opening

Optional

Insulation

In Outside

Walls Of

Chase

Solid

Continuous

Surface

Outside

Base

Insulation

(Thermal Barrier)

8'

Level

Note: Floor 

and wall 

below the 

attic must 

be insulated 

using the 

same 

insulation.

•  Must have the same firestopping 

resistance as adjacent wall.

•  Must have the same insulation as 

adjacent ceiling.

•   Follow local rules regarding fram-

ing construction.  

FRAMING DIMENSIONS

Fireplace Opening Width

A

46-3/8”

1178 mm

B

49-1/2”

1257 mm

C

42-3/4”

1086 mm

D

20-7/8”

530 mm

E

93-7/8”

2384 mm

F

47”

1194 mm

G

27-3/4”

705 mm

J

66-3/8”

1686 mm

Notes

Due to Lennox' ongoing commitment to quality, all specifications, 

ratings and dimensions are subject to change without notice.
All framing dimensions calculated for 1/2" dry wall at the fireplace 

face.  If sheathing the chase or finishing with other thickness materials, 

calculations will  need to be made.
* The fireplace must not be in contact with any insulation or loose 

filling  material.  Cover  the  insulation  with  Drywall  panels  around 

the fireplace.

Fireplace Framing

Header

B

A

*   Total depth is 25 inches including the 

back spacer minus 1/2 inch for drywall 

to be flush with the facing.

7’

Min.

B

G

A

2” x 3” 

Min.

Rough Framing Face 

(unfinished shown)

29-1/2”

23-3/4”

F

D

J

E

7/8”

11-1/8”

16-1/4”

26-1/8”

1”

1-5/32”

26-1/4”

10-1/4”

41-3/4”

49-3/8”

46-1/4”

43-1/4”

37”

31”

15”

7”

4-1/4”

28-1/2”

5-5/8”

20-1/8”

28-1/2”

5-5/8”

10-3/8”

3”

OUTSIDE CHASE 

Back Wall of Chase/Enclosure 

Including Finising Materials if any 

Rough Framing Face (Unfinished Shown) 

 

 

 

 

* Zero Clearance 

   From Back 

   Spacer to Wall 

CORNER

INSTALLATION

Plywood

Figure 10

NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

9

Содержание 038M

Страница 1: ...HESE INSTRUCTIONS FOR FUTURE REFERENCE Listed to standards ULC S610 UL 127 Report No 304 7213 EPA Cert No 609 WARNINGS Hot Do not touch The glass and surfaces of this appliance will be hot during oper...

Страница 2: ...re left partly opened smoke may be drawn into the room Use optional firescreen when doors are fully opened WARNING Usecarewhenselectingwindow treatments for windows located near the fireplace Avoid us...

Страница 3: ...Required Fireplace model MONTEST 7 diameterchimney Model SecureTemp S 2100 Nova Temp HT6000 Secure TempGX U S only or ACBI manufactured by Security Chimneys International only including Chimney lengt...

Страница 4: ...lburnveryintenselyus ing this method and may damage the firebox Medium Combustion This is the recommended mode of operating the Montecito Estate and should be the one normally used since it will depos...

Страница 5: ...g time will be between 6 8 hours and at this combustion rate the level of BTU s is at its lowest Building a Fire A To start a fire place several crumpled up ballsofnewspaperinthefirebox Placesmall dry...

Страница 6: ...he chimney WARNING When cleaning the fireplace the ashes should be placed in a metal container with a tight fitting lid The closed container of ashes should be placed on a non combustible floor or on...

Страница 7: ...s 1 400 F If the glass breaks or cracks it must be replaced with an identical ceramic glass Tempered glass or ordinary glass will not withstand the high temperatures of the Montecito Estate Replacemen...

Страница 8: ...1 A Frame the fireplace using 2 x 3 or heavier lumber B WARNING Combustible materials cannot be used in the space directly above the fireplace except for the studs above the fa cade that support the f...

Страница 9: ...3 4 705 mm J 66 3 8 1686 mm Notes Due to Lennox ongoing commitment to quality all specifications ratings and dimensions are subject to change without notice All framing dimensions calculated for 1 2 d...

Страница 10: ...It is located in the bottom of the fireplace towards the back It uses 120 V and must be connected to the main electrical circuit byaqualifiedelectrician Forconnection usethe electrical box supplied wi...

Страница 11: ...heat A furnace duct is only single wall and not double wall as is required for the Montecito Estate hot air exhaust 7 Use only Security Chimneys International grills and components as described in thi...

Страница 12: ...above or below floor level Makea4 1 4 110mm holeintheoutsidewallofthehouseatthechosen location From outside place the outside air register in the hole open side down and fasten the register to the wal...

Страница 13: ...are located on lower floors in the house such as in a basement in combination with an outside chimney are especially prone to flow reversal 2 The fireplace model MONTEST may be installed only with Se...

Страница 14: ...rsal support AC10SU 4 Put the roof flashing in place and seal the joint between the roof and the flashing with roofing pitch see Figures 25 26 For sloping roofs place the flashing under the upper shin...

Страница 15: ...uctions on Page 14 5 From below install a firestop See Figure 23a 6 A support XST or XSO must be used on the first 15 section 5 m 7 Continue with the regular installation ACBI Chimney 1 Install the fi...

Страница 16: ...mm 45 21 32 1160 mm 54 1 8 1375 mm B 17 9 16 446 mm 20 7 16 519 mm 24 5 8 625 mm 28 7 8 733mm 37 3 8 949 mm 42 1067 mm 44 3 4 1137 mm 49 1245 mm 59 9 32 1353 mm 61 3 4 1568 mm Chimney Elbow Offset Hei...

Страница 17: ...diation Shield Framing 2 x 3 Figure 29 Roof Support Note In cold areas it is recommended to protect the chimney in a insulated chase Straps Chimney ACBI ACBI Starter Section Straps Outside Wall OFFSET...

Страница 18: ...t of supported chimney NOTE For the ACBI chimney a support section ACBI7SL must be used every 30 feet 9m or an universal support every 20 feet 6m instead of the universal roof support ST CHIMNEY MAXIM...

Страница 19: ...ill enter the masonry chimney 2 In the middle of the oval drill a hole in the masonry chimney at 30 3 Increase the size of the hole until a 30 TUBINOX liner elbow can be easily slipped through 4 Slide...

Страница 20: ...ECMC H4855 Outside Air Kit included with fireplace Outside Air Coupler To Connect Outside Air UZI To Fireplace UZIAD UZIAD Outside Air Ducting includes 4 insulated flex x 10 long UZI UZI Gravity Kit G...

Страница 21: ...ashing Adjustable 30 45 includes spacer collar ACBI7FBR H3277 Misc Firestop ACBI7BF H3268 Radiation Shield ACBI7RS H3269 Attic Radiation Shield ACBI7RSA H3270 Telescopic Attic Radiation Shield ACBI7RS...

Страница 22: ...PR SR2417 Right Side Refractory Bricks Front PR SR2419 Left Side Refractory Bricks Back PR SR2416 Left Side Refractory Bricks Front PR SR2418 Bottom Refractory Brick PR SR2422 Wooden Door Handle PR SR...

Страница 23: ...NOTES 23...

Страница 24: ...ction which were not manufactured or supplied by LHP or for the labor necessary to install repair or remove such materials parts or construction All replacement or repair components will be shipped F...

Отзывы: