USAGE
Overlap 80/100/120 mm
LEISTER Varimat V
10
Welding procedure
• Adjust welding parameters, see page 6.
• The welding temperature must be achieved (heating up time approx. 5 min.).
If the temperature is not achieved, reduce the airflow.
•
Do a test run.
• Pull the
locking lever (11)
, lower the
hot air blower (8)
and position it between
the overlapped sheets until it stops. The drive motor will start automatically.
If it does not start, see sensor adjustment, page 5.
The machine can be started manually by pressing key .
• The automatic welding machine is guided along the overlap with the
guide
bar (27)
. Do not apply pressure to the
guide bar (27)
this could lead to welding
faults. Keep watching the
guide roller (18)
position.
• After welding, pull the
locking lever (11)
, take the
hot air blower (8)
out until it
stops and swivel up until it locks.
• When the welding is completed switch off heater with the and keys
on the
keyboard (4)
, so that
the welding nozzle (8)
cools down.
• Switch off
main switch (3)
.
Tool positioning
• Tip up the Automatic Welding Machine by applying pressure to the
guide bar
(27)
and position it ready for welding.
• Release the
transport roller (16)
by lifting it with the
guide bar (27)
.
• Push the
transport roller (16)
to the left until it stops by applying light pressure
to the
shift spring (19)
.
• Swivel
the guide roller (18)
down.
•
The guide roller (18)
should be set parallel to the edge of the
pendulum
action roller (12)
(see illustration E).
• Do a test run
• To correct the tracking, adjust the
adjustment screw for tracking (13)
(see
illustration F and G, and the function notes on the automatic welding
machine).
Illustration E
12
18
Illustration F
Illustration G
12
12
13
13
H
+
M