
15
Operation
UNIPLAN S
Operating condition
• Before putting into operation, check
power supply cord (2)
and connector as well as
extension cable for electrical and mechanical damage.
• Check the nozzle’s basic setting (see diagram).
Connect tool to rated voltage.
Rated voltage
stated on the device must correspond to line/mains voltage.
Extract hot-air blower in case of
power breakdown.
Operating Instructions
• Perform a test welding according to the welding instructions of the material manufacturer and the national
standards or guidelines. Check the test welding. Adapt the welding temperature (welding parameters) as
required.
Tool positioning
• Swivel
hot air blower (3)
using
swivel lever (20)
up to the stop.
• Operate
lifting device (11)
by means of
lifting device lever (14)
so that
drive/pressure roller (6)
and
drive
roller (9)
are at no-load.
• Position the automatic welding machine on the overlap of the material to be welded. The outside edge of
drive/pressure roller (6)
must line up with the overlap edge of the material to be welded.
• Activate
lifting device (11)
by means of
lifting device lever (14)
so that the automatic welder is ready to run.
Welding parameters
• Set
potentiometer for welding speed (16)
to the required value.
• Set
potentiometer for air flow (18)
to the required value.
•
Turn on
air blower switch (17).
Set the
two stage switch for airflow (19)
at setting 3 and heat up for about 5
minutes.
•
Important: low voltage.
If the maximum temperature is not reached, reduce the airflow by means of the
manual air valve (13)
and
two
stage switch for airflow (19).
• The contact pressure is effected through the weight of the automatic hot air welding machine itself. Use the
additional weight accessory as required (see assembly of additional weight, page 13).
Welding procedure
• Swivel the
hot air blower (3)
up to the stop using
swivel lever (20)
and at the same time turn on the
drive
switch (15)
(the welding process starts).
•
Supervise the welding process. As necessary correct the welding speed with the
potentiometer (16).
Lead the
automatic welding machine by its chassis along the length of the overlap.
• When welding has finished, swing up the
hot air blower (3)
to the stop by means of the
swivel lever (20).
• Switch off the
drive switch (15).
• After completing welding work, set the
potentiometer for air temperature (18)
to zero, so that the
hot air
blower (3)
cools down. Then turn off the
air blower switch (17).
Disconnect
power supply cord (2)
form the line/mains.
1–
2 m
m
40 – 50
mm
6
4
FI
230
400
230
400
Содержание UNIFLOOR S
Страница 83: ......