Description of tool
3
OPERATION
LEISTER Hotwind S
1. Power supply cord
2. On/off switch stage 0 = off
stage 1 = on (cold air)
3. Switch for
stage 2 = off
heater
stage 3 = on
4. Potentiometer for
temperature control
5. Air slide
6. Air intake
7. Removable handle
8. Element housing with protective
tube
9. Plastic housing
10. Six M5 drilled and tapped holes for
fixing into installation
1
6
5
9
10
8
2
3 4
7
• Installation dimensions in mm
Installation
• When fixing, the
drilled
and tapped holes M5 (9)
on the bottom side of the
housing should be used.
• If necessary, attach
handle (6)
by push-fitting
sideways.
• When installing the tool,
make sure that
- only cold air is sucked in
- no air is sucked in from
the hot-air tool
- no (warm air) back
pressure develops
- the hot-air tool is not in
direct line of the hot-air
flow from another hot-
air tool.
• For use in a dusty environ-
ment the tool should be
fitted with a LEISTER stain-
less steel filter on the
air
intake (5).
Where a parti-
cularly critical dust pro-
blem exists (eg metal,
electrically charged or
damp dust) special filters
must be used to avoid
short circuiting the tool.
• Protect the tool from
vibration and shock.