15
7. Frequently asked questions, causes, and measures
The blower does not switch itself off immediately after the toggle switches (5) have been switched off:
• The AIRSTREAM ST is equipped with an extra device cool-down function. When both
toggle switches (5)
have
been switched off, the blower continues to run for 5 minutes and then switches itself off automatically.
The right ball valve (8) cannot be completely closed:
• The blower must continually move at least 40 l/min. for cooling, otherwise the blower can overheat. For this
reason, the right
ball valve (8)
may not be completely closed.
The circuit breaker (4) is triggered when the hot-air blower is turned on:
• The attached hot-air blower exceeds the max. allowable power of 16 A. Either remove a hot-air blower or reduce
the temperatures.
When setting the air volume via the left ball valve (8), the air volume on the right side changes:
• This is normal. Both air outlets are connected to the blower in parallel. The blower delivers a maximum of 200 l/min.
air. These 200 l/min. can only be supplied at one air outlet. If the second air outlet is opened, the air volume on the
first air outlet is reduced.
Leister Technologies AG, Galileo-Strasse 10, CH-6056 Kägiswil, Switzerland
confirms that in the model made
available for purchase, this product fulfills the requirements of the following EU directives.
Guidelines:
2014/30, 2014/35, 2011/65
Harmonized standards:
EN 55014-1, EN 61000-6-2, EN 61000-3-2, EN 61000-3-3, EN 60335-1,
EN 60335-2-55, EN 50581
Name of the
authorized document official:
Volker Pohl, Manager Product Conformity
Kaegiswil, 8/31/2017
Bruno von Wyl, CTO
Christioph Baumgartner, GM
8. Declaration of Conformity
Never dispose of electrical equipment with household refuse.
Electrical equipment, accessories and packagings should be subjected to environmentally friendly
recycling.
9. Disposal
Содержание AIRSTREAM ST
Страница 66: ...66 RUS Leister AIRSTREAM ST 1 AIRSTREAM ST FI...
Страница 68: ...68 4 AIRSTREAM ST 4 1 4 2 11 Leister 1 AIRSTREAM ST 1 2 4 1 4 3 1 2 3 4 5 6 7 8 9 10 11 1 2 3 4 10 11 5 6 7 8 9...
Страница 69: ...69 5 5 1 8 9 200 4 6 6 1 1 2 7 7 6 8 6 2...
Страница 70: ...70 5 5 5 5 5 1 6 3 6 4 3 1 2 1 6 6 5...
Страница 73: ...73 CN Leister AIRSTREAM ST 1 AIRSTREAM ST...
Страница 75: ...75 4 AIRSTREAM ST 4 1 4 2 11 1 AIRSTREAM ST 1 2 4 1 4 3 1 2 3 4 5 6 7 8 9 10 11 1 2 3 4 10 11 5 6 7 8 9...
Страница 76: ...76 5 5 1 8 9 200 L min 4 6 6 1 1 2 7 7 6 8 6 2...
Страница 77: ...77 5 5 5 5 5 1 6 3 6 4 3 1 1 6 6 5...
Страница 79: ...79 Pb Hg Cd Cr VI PBB PBDE PCB SJ T 11364 GB T 26572 GB T 26572...