a
b
c
d
e
f
012566_001
a
GG04 plus
b
GEB212 battery
c
Pole
d
CS25 plus or Zeno 5 field
controller
e
AZ204, GHT55 or GHT72
pole holder
f
GHT63 pole clamp
Step
Description
1.
Attach the GHT63 pole clamp to the pole.
2.
Attach the correct pole holder to the clamp, according to the field
controller:
•
the GHT72 pole holder for the CS25 plus controller
•
the GHT55 pole holder for the Zeno 5 controller
3.
Clip the field controller into the holder and lock it by pushing the
locking pin into the locked position.
4.
Insert the battery into the field controller.
5.
Press the ON/OFF key on the field controller to switch on.
6.
Insert the battery into the GG04 plus.
7.
Press the ON/OFF key on the GG04 plus to switch on.
8.
Screw the GG04 plus to the top of the pole.
9.
Start the Zeno GIS software on the controller and select the GG04
plus instrument to be connected through Bluetooth.
3.3.2
Setup with Third-Party Mobile Devices
The equipment setup is used for real-time rover with extended periods of use
in the field with a third-party Android, iOS or Windows mobile device.
Equipment setup
Equipment setup
step-by-step
Use
Operation
21
Содержание Zeno GG04 plus
Страница 1: ...Leica Zeno GG04 plus User Manual Version 1 0 English ...
Страница 37: ......