FUNCTION DESCRIPTION

A distinction is made between „offline operation“ and „online operation“ for the controllers:

„Offline-operation“:
The LEHMANN Captos and Captos iCharge locks can either be configured with master and programming cards or 
with the LEHMANN Management Software LMS. In “offline operation”, the controllers are mainly used to supply 
power to the locks.
If the locks are configured and managed in „offline mode“ with the LMS, then the locks are not directly networked 
with the LMS via the customer‘s network. In this case, configuration changes are transferred to the locks using the 
LEHMANN Data Transfer app and an NFC-enabled Android smartphone.
Primary controllers and secondary controllers supply the Captos and Captos iCharge locks with power via cable. Up 
to 24 locks can be connected to one controller. A data cable is not required between the controllers in „offline ope-
ration“. If Captos locks are connected to the controllers, up to three controllers can be supplied with power from one 
power supply unit. To do this, the controllers must be connected to one another with power connection cables. If 
Captos iCharge locks are connected to the controllers, each controller must be supplied with power from a separate 
power supply unit.

Figure: Schematic representation of „offline operation”

1

Netzteil (bei Captos Schlössern nur an jedem 3. Controller erforderlich)

CAPTOS iCharge

(max. 24 per Controller)

Daten-Verbindungskabel RJ11

Strom-Verbindungskabel Mini DIN

Primary oder Secondary Controller
(sofern zu einem späteren Zeitpunkt auf einen „Online-Betrieb“ gewechselt werden soll, ist mindestens ein Primary Controller notwendig.)

CAPTOS

(max. 24 per Controller)

1

1

1

1

1

CAPTOS iCharge

(max. 24 per Controller)

CAPTOS

(max. 24 per Controller)

1

Kupplung / Stecker zum Verbinden 
von zwei Daten-Verbindungskabeln

Primary or secondary controller
(if you want to switch to „online operation“ at a later point in time,
at least one primary controller is required.)

Power supply unit (with Captos locks only required on every 3rd controller)

Data connection cable RJ12

Power connection cable Mini DIN

Coupling / plug for connecting two data connection cables

1

Netzteil (bei Captos Schlössern nur an jedem 3. Controller erforderlich)

CAPTOS iCharge

(max. 24 pro Controller)

Daten-Verbindungskabel RJ11
Strom-Verbindungskabel Mini DIN

Primary oder Secondary Controller

(sofern zu einem späteren Zeitpunkt auf einen „Online-Betrieb“ gewechselt werden soll, ist mindestens ein Primary Controller notwendig.)

CAPTOS

(max. 24 pro Controller)

1

1

1

1

1

CAPTOS iCharge

(max. 24 pro Controller)

CAPTOS

(max. 24 pro Controller)

1

Kupplung / Stecker zum Verbinden 

von zwei Daten-Verbindungskabeln

„Online-operation“:
During „online operation“, the locks are managed and configured in the LEHMANN Management Software LMS 
(license key „LMS Online“). The LMS is operated in the customer‘s IT infrastructure. The Captos or Captos iCharge 
locks are connected directly to the customer‘s network and thus to the LMS via the primary controller. The 
controllers supply the locks with power and also ensure data communication between the LMS and the locks. The 
primary controller is connected to the customer‘s network via Ethernet cable and acts as a transfer point. At least 
one primary controller is required for „online operation“. Several primary controllers can be used in a project. Up 
to 24 locks and a total of up to 32 secondary controllers can be connected in series to a primary controller. The 
controllers are connected to one another with connecting cables. Up to 24 locks can also be connected to each 
secondary controller. If Captos locks are connected to the controllers, up to three controllers can be supplied with 

Содержание Primary Controller

Страница 1: ...ting from lock to controller recommendation 9 Connecting the controller 10 Emergency power supply 13 Firmware update of the controller Firmware update of the locks via the controller Disposal 14 www lehmann locks com Operating Instructions GB Primary Controller Secondary Controller For connecting the RFID locks Captos and Captos iCharge BDA Primary Controller Secondary Controller 22 02 17 GB Secon...

Страница 2: ...ments for electrical installations must be considered Installation may only be carried out by qualified personnel Electric shock U Touching parts can lead to injuries from electric shock U Do not touch the terminals when the product is receiving power U The installation commissioning and maintenance of our devices must be carried out by appropriately qualified personnel In particular electrical co...

Страница 3: ...Secondary Controller Nominal Voltage 12 VDC Power Supply external Power Supply 100 240 VAC 50 60 Hz 2 A 138 W max Operating temperature 5 C to 60 C Storage temperature 25 C to 70 C Interfaces Controller Primary to Server Ethernet Controller to Controller RS485 Controller to Locks RS485 Connectors Power KYCON KPPX 4P Controller Primary to Server RJ45 Controller to Controller RJ45 Controller to Lock...

Страница 4: ...ocks and Lehmann Management Software LMS Transfer point to the customer s LAN Communication between secondary controller and LMS Secondary Controller Power supply to the locks Communication between locks and primary controller Power supply Power supply of a primary or secondary controller When using Captos locks one power supply unit can supply up to three controllers with power When using Captos ...

Страница 5: ...er 1 1 1 1 1 CAPTOS iCharge max 24 per Controller CAPTOS max 24 per Controller 1 Kupplung Stecker zum Verbinden von zwei Daten Verbindungskabeln Primary or secondary controller if you want to switch to online operation at a later point in time at least one primary controller is required Power supply unit with Captos locks only required on every 3rd controller Data connection cable RJ12 Power conne...

Страница 6: ... Controller Netzteil bei Captos nur an jedem 3 Controller CAPTOS iCharge max 24 pro Controller Daten Verbindungskabel RJ11 Strom Verbindungskabel Mini DIN Secondary Controller max 32 hinter einem Primary Controller LAN Kundenseitig CAPTOS max 24 pro Controller 1 3 4 3 CAPTOS iCharge max 24 pro Controller Kupplung Stecker zum Verbinden von zwei Daten Verbindungskabeln Power supply unit with Captos ...

Страница 7: ...92 120 104 DIMENSIONS Primary Controller Secondary Controller Power cord Connection cable 7 2 500 2 4 7 2 500 2 4 All dimensions in mm Power supply 72 175 35 1 000 72 175 35 1 000 Power connection cable 5 000 14 14 1 800 Other variants with country specific plugs of the same length are available ...

Страница 8: ...plug for connecting two data connection cables 26 96 14 48 16 75 8 1 16 13 19 49 26 96 48 75 26 96 1 75 8 1 16 13 19 49 2 14 48 16 75 DESCRIPTION OF THE INTERFACES Primary Controller Secondary Controller All dimensions in mm 192 4 104 1 192 4 104 1 4 192 1 4 192 104 1 ...

Страница 9: ...binet out of its installation position and then to loosen the cables from the locks in the next step For example couplings cable connection sockets can be used to remove or replace individual cabinets from the cabinet wall without great effort Alternatively a correspondingly large cable loop can be laid with continuous cabling It should be absolutely avoided that cables are subjected to tensile st...

Страница 10: ...wer supply Figure Secondary controller power connection Connecting the connection cable from the lock to the controller The locks are connected to the controller with connecting cables The connecting cables of the locks must not be shortened If the cable is too short a second connection cable can be used as an extension by means of a coupling Insert the RJ12 plug of the connection cables that come...

Страница 11: ... with one power supply unit ATTENTION This function is only possible with Captos and not with Captos iCharge locks The controller is supplied with power via the 100 240V power supply unit If Captos locks are used only one power supply unit is required for up to three controllers In this case the first controller is connected to the power supply unit the two following controllers are connected to e...

Страница 12: ...r online operation the primary controller must be connected to the customer s network LAN Only primary controllers can be connected with an Ethernet cable to the LAN and thus to the server on which the LEHMANN management software LMS is installed Several primary controllers can be used per project They are connected to the network separately Figure Connection of the Ethernet cable to the primary c...

Страница 13: ...ocks cannot be opened or closed The locks do not open automatically in the event of a power failure Changes to the configuration or authorization are also not transferred during a power failure It is therefore recommended to consider an emergency power supply when planning the project with Captos or Captos iCharge locks The emergency power supply can be connected in the form of a UPS uninterruptib...

Страница 14: ... the LMS operating instructions or the LEHMANN Firmware Updater software DISPOSAL Dispose of the controller in accordance with local regulations and guidelines FIRMWARE UPDATE OF THE LOCKS VIA THE CONTROLLER If the Captos and Captos iCharge locks are used in online operation a firmware update is carried out on the locks via the LEHMANN Management Software LMS if required This process takes place a...

Страница 15: ...BDA Primary Controller Secondary Controller 22 02 17 GB 15 NOTES ...

Страница 16: ...econdary Controller 22 02 17 GB 16 LEHMANN Vertriebsgesellschaft mbH Co KG Uphauser Weg 82 D 32429 Minden Fon 49 571 50 599 0 Fax 49 571 50 599 822 info lehmann locks com www lehmann locks com DIN EN ISO 9001 2015 zertifiziert ...

Отзывы: