BD
A Primar
y Con
tr
oller / Sec
ondar
y Con
tr
oller 22-02-17 (GB)
10
CONNECTING THE CONTROLLER
Power supply of the controller:
The controller is supplied with power via the 100 / 240V power supply unit. The country-specific power cord must also
be ordered for this power supply unit. Depending on the country of use, different cables are available for the power
supply unit. The power cables must not be shortened. Connect the incoming power cable from the power supply to the
IN socket on the controller. Connect the power supply to a secured socket.
Figure: Primary controller power connection
192
12
0
4
10
4
IN: Power cable from the power supply
Figure: Secondary controller power connection
Connecting the connection cable from the lock to the controller:
The locks are connected to the controller with connecting cables. The connecting cables of the locks must not be
shortened. If the cable is too short, a second connection cable can be used as an extension by means of a coupling.
Insert the RJ12 plug of the connection cables that come from the locks into the connections on the controller (sockets
1 - 12 on the front, sockets 13 - 24 on the back). There is no need to adhere to a specific sequence when assigning the
connections for the connection cables on the controller. Up to 24 locks can be connected to one controller.
Figure: Connecting the connecting cable from the lock to the primary controller
4
192
12
0
10
4
IN: Power cable from the power supply
192
12
0
4
10
4
7
2.500
2,
4