
37
KEOR LINE RT 1000, 1500, 2200, 3000 VA
EN
7 UPS Maintenance
Battery Replacement
When the UPS is started up or a self-test is executed, the Battery Replacement LED might light up
due to battery weak or battery dead.
1. When the Battery-Replacement (RED) lights up, you may re-charge the UPS for atleast 8 ~ 10
hours and verify whether the LED lights up again after the Self-test function is executed again.
2. In case the battery replacement LED(RED) still lights up it is necessary to replace the battery.
Please read the following instruction for further details.
How to replace the batteries
CAUTION
The batteries replacement must be executed in a SERVICE ACCESS AREA.
CAUTION
The battery is heavy, pull the battery out onto flat, stable surface.
CAUTION
DO NOT DISCONNECT the batteries while the UPS is in the BACKUP mode.
• Batteries service must be performed or supervised by Legrand expert personnel knowledgeable
about batteries and the required precautions.
• When replacing batteries, replace with the same type and number of batteries or battery packs.
• Do not dispose of batteries in a fire. The batteries may explode.
• Do not open or mutilate batteries. Released electrolyte is harmful to the skin and eyes. It may be
toxic.
• A battery can present a risk of electrical shock and high short circuit current.
The followingprecautions should be observed when working on batteries:
a) Remove watches, rings, or other metal objects.
b) Use tools with insulated handles.
c) Wear rubber gloves and boots.
d) Do not lay tools or metal parts on top of batteries.
e) Disconnect charging source prior to connecting or disconnecting battery terminals
Содержание KEOR LINE RT 1000 VA
Страница 11: ...11 KEOR LINE RT 1000 1500 2200 3000 VA FR Configuration Rack S2 S2 B1 B2 S3 B1 Step 1 Step 2 Step 3 ...
Страница 12: ...12 5 Installation Step 4 Step 5 ...
Страница 18: ...18 7 Maintenance de l onduleur Step 1 Step 2 Step 3 ...
Страница 22: ......
Страница 31: ...31 KEOR LINE RT 1000 1500 2200 3000 VA EN Rack Mount Setup S2 S2 B1 B2 S3 B1 Step 1 Step 2 Step 3 ...
Страница 32: ...32 5 Installation Step 4 Step 5 ...
Страница 38: ...38 7 UPS Maintenance Step 1 Step 2 Step 3 ...
Страница 42: ......
Страница 51: ...51 KEOR LINE RT 1000 1500 2200 3000 VA IT Configurazione Rack S2 S2 B1 B2 S3 B1 Fase 1 Fase 2 Fase 3 ...
Страница 52: ...52 5 Installazione Fase 4 Fase 5 ...
Страница 58: ...58 7 Manutenzione del gruppo di continuità Fase 1 Fase 2 Fase 3 ...
Страница 62: ......
Страница 71: ...71 KEOR LINE RT 1000 1500 2200 3000 VA DE Rack Konfiguration S2 S2 B1 B2 S3 B1 Phase 1 Phase 2 Phase 3 ...
Страница 72: ...72 5 Installation Phase 4 Phase 5 ...
Страница 78: ...78 7 Wartung der unterbrechungsfreien Stromversorgung Phase 1 Phase 2 Phase 3 ...
Страница 82: ......
Страница 91: ...91 KEOR LINE RT 1000 1500 2200 3000 VA ES Configuración Rack S2 S2 B1 B2 S3 B1 Fase 1 Fase 2 Fase 3 ...
Страница 92: ...92 5 Instalación Fase 4 Fase 5 ...
Страница 98: ...98 7 Mantenimiento del SAI Fase 1 Fase 2 Fase 3 ...
Страница 102: ......
Страница 111: ...111 KEOR LINE RT 1000 1500 2200 3000 VA NL Installeren in rack S2 S2 B1 B2 S3 B1 Stap 1 Stap 2 Stap 3 ...
Страница 112: ...112 5 Installatie Stap 4 Stap 5 ...
Страница 118: ...118 7 Onderhoud van de UPS Stap 1 Stap 2 Stap 3 ...
Страница 122: ......
Страница 131: ...RU 131 ИБП KEOR LINE RT 1000 1500 2200 3000 Монтаж в горизонтальном положении S2 S2 B1 B2 S3 B1 Шаг 1 Шаг 2 Шаг 3 ...
Страница 132: ...132 5 Монтаж Шаг 4 Шаг 5 ...
Страница 138: ...138 7 Техническое обслуживание ИБП Шаг 1 Шаг 2 Шаг 3 ...
Страница 142: ...Notes ...
Страница 143: ......