
33
KEOR LINE RT 1000, 1500, 2200, 3000 VA
EN
UPS connections
Connect the UPS to a grounded AC power wall outlet using the power cord included in the
packaging.Then plug the loads into the outlets available on the rear of the UPS.
The UPS outlets provide battery backup and surge protection to the equipment connected.
To use the UPS as a master “On/Off” switch, make sure that all the loads power buttons are
switched on.
CAUTION
Do not connect a laser printer to the UPS outlets
Network connection
To protect network devices ( modem, Ethernet data….) against surges, connect the device to the
UPS RJ45 output through a 10 base-T/100 base-T cable, then connect the UPS RJ45 input to the
wall outlet using a cable with the same characteristics
Содержание KEOR LINE RT 1000 VA
Страница 11: ...11 KEOR LINE RT 1000 1500 2200 3000 VA FR Configuration Rack S2 S2 B1 B2 S3 B1 Step 1 Step 2 Step 3 ...
Страница 12: ...12 5 Installation Step 4 Step 5 ...
Страница 18: ...18 7 Maintenance de l onduleur Step 1 Step 2 Step 3 ...
Страница 22: ......
Страница 31: ...31 KEOR LINE RT 1000 1500 2200 3000 VA EN Rack Mount Setup S2 S2 B1 B2 S3 B1 Step 1 Step 2 Step 3 ...
Страница 32: ...32 5 Installation Step 4 Step 5 ...
Страница 38: ...38 7 UPS Maintenance Step 1 Step 2 Step 3 ...
Страница 42: ......
Страница 51: ...51 KEOR LINE RT 1000 1500 2200 3000 VA IT Configurazione Rack S2 S2 B1 B2 S3 B1 Fase 1 Fase 2 Fase 3 ...
Страница 52: ...52 5 Installazione Fase 4 Fase 5 ...
Страница 58: ...58 7 Manutenzione del gruppo di continuità Fase 1 Fase 2 Fase 3 ...
Страница 62: ......
Страница 71: ...71 KEOR LINE RT 1000 1500 2200 3000 VA DE Rack Konfiguration S2 S2 B1 B2 S3 B1 Phase 1 Phase 2 Phase 3 ...
Страница 72: ...72 5 Installation Phase 4 Phase 5 ...
Страница 78: ...78 7 Wartung der unterbrechungsfreien Stromversorgung Phase 1 Phase 2 Phase 3 ...
Страница 82: ......
Страница 91: ...91 KEOR LINE RT 1000 1500 2200 3000 VA ES Configuración Rack S2 S2 B1 B2 S3 B1 Fase 1 Fase 2 Fase 3 ...
Страница 92: ...92 5 Instalación Fase 4 Fase 5 ...
Страница 98: ...98 7 Mantenimiento del SAI Fase 1 Fase 2 Fase 3 ...
Страница 102: ......
Страница 111: ...111 KEOR LINE RT 1000 1500 2200 3000 VA NL Installeren in rack S2 S2 B1 B2 S3 B1 Stap 1 Stap 2 Stap 3 ...
Страница 112: ...112 5 Installatie Stap 4 Stap 5 ...
Страница 118: ...118 7 Onderhoud van de UPS Stap 1 Stap 2 Stap 3 ...
Страница 122: ......
Страница 131: ...RU 131 ИБП KEOR LINE RT 1000 1500 2200 3000 Монтаж в горизонтальном положении S2 S2 B1 B2 S3 B1 Шаг 1 Шаг 2 Шаг 3 ...
Страница 132: ...132 5 Монтаж Шаг 4 Шаг 5 ...
Страница 138: ...138 7 Техническое обслуживание ИБП Шаг 1 Шаг 2 Шаг 3 ...
Страница 142: ...Notes ...
Страница 143: ......