6
TOOLS REQUIRED FOR INSTALLATION
PARTS INCLUDED
#2 Phillips
1/4”
5/32”
optional
OPTIONAL PARTS PER CUSTOM CONFIGURATION (NOT INCLUDED)
Conduit Connectors
Flexible Conduit 1/2”, 1” or 1-1/4”
3” x 2” Switch Box
(2” deep)
Raco #420 or equiv.
Electrical
Outlet
Outlet Box Cover
Zip Ties
1
2
3 4
5
#2 Flathead
NOTE: Some items may vary depending on specific model number.
#10-24 x 1/4
Button Head
Security Screw
L
Cable Lock
(Wire Vice)
E
#10-24 x 1/4
Pan Head
Machine Screw
(2x)
(4x)
(4x)
(4x)
(4x)
Chief
CMS1RU
Shelf Rack
Adaptor (4x)
D
Install Box
(CMS492 shown)
A
Component
Shelf
B
Projector Mount Plate
C
#10-24 x 5/8
Pan Head
Tapping Screw
G
(4x)
#10-24 x 1”
Pan Head
Tapping Screw
H
.262 x 1 5/16
Eye Lag
J
25 ft length
Cable
N
Security
Spinner
F
1/4" x 2"
Wire Anchor
K
5/32” Security Key
M
(4x)
#10-24
Thumb Nut
I
Installation Instructions
CMS491/492
Projector Mount Plate
Tile Side Trim
P
(4x)
Hardware Bag #1
Hardware Bag #2