background image

1

2

HOT WATER - IN

COLD WATER - IN

mixed water out

3

4

75~100mm

wall surface

95~100mm

135~140mm

R15mm

4

Steps 1-4

Installation Procedure

Lefroy Brooks always recommends that plumbing products be installed by a licensed professional. 
Shut off main water supply before installation.

1

 

Position valve into the wall as shown.

2

 

Connect the valve to the water pipes.

3

 

Cut a hole on the wall surface for fitting the trim kit. The hole dimension is as shown in figure 3.

4

 

Throw away the protective cap only whenthe building construction is completed and you are  

 

 

ready to fit the trim kit.

 

REMOVE CAP ONLY, KEEP THE REST OF THE MUD GUARD AS IT IS NEEDED TO HOLD THE TRIM    

 FIXING 

SCREWS.

Содержание M2-4300

Страница 1: ...INSTALLATION OPERATING MAINTENANCE INSTRUCTIONS M2 4300 FLEETWOOD SINGLE CROSS HANDLE PRESSURE BALANCE TRIM ONLY TO SUIT M1 4100 ROUGH ...

Страница 2: ...2 Contents Dimensions 3 Instalation Procedure 4 Parts List 6 Fault Finder 8 Safety Tips Care and Maintenance 9 Guarantee 10 ...

Страница 3: ...m 2 1 16 3 1 16 52mm 77mm Ø3 Ø76mm 3 16 5mm 3 Dimensions in Inches Millimetres Whilst every effort is made to ensure accuracy design and dimensions are subject to change without notice as part of the company s product development process ...

Страница 4: ...hut off main water supply before installation 1 Position valve into the wall as shown 2 Connect the valve to the water pipes 3 Cut a hole on the wall surface for fitting the trim kit The hole dimension is as shown in figure 3 4 Throw away the protective cap only whenthe building construction is completed and you are ready to fit the trim kit REMOVE CAP ONLY KEEP THE REST OF THE MUD GUARD AS IT IS NEE...

Страница 5: ...B marked 049001 0 tooth 8 teeth 12 teeth HIGHT TEMPERATURE SETTING AVERAGE TEMPERATURE SETTING with 90 operation range LOW TEMPERATURE SETTING with 60 operation range 5 Temperature Limiting Device Remove washer C then take off stopper A B 6 Turn the valve stem so that the round dimple on the stem is facing upwards 7 Install stopper A onto valve stem Notch on stopper A should point upward 8 Install...

Страница 6: ...edure Lefroy Brooks always recommends that plumbing products be installed by a licensed professional Shut off main water supply before installation 10 Install washer 11 Install canopy 12 Fix front plate 13 Install handle Steps 10 13 ...

Страница 7: ...extension 110389 4 Canopy 018211 T 5 O ring 048060 6 Escutcheon 071437 50 7 Adjusting ring 104292 8 Front plate 006227 9 Seal 013119 10 Screw 008186 11 Set screw 065086 12 Set screw 292598 7 5 6 11 8 4 1 12 9 3 2 10 7 Parts List Exploded view ...

Страница 8: ...8 Fault Finder Fault Cause Rectification Leaks underneath handle O ring on cartridge H I is dirty or damaged Clean or replace O ring ...

Страница 9: ... water pressure between hot and cold supplies to the mixing valve the pressures should be equalized by a plumber in accordance with best practice and legislation Maintenance Your new bathroom faucet is designed for years of trouble free performance Keep it looking new by cleaning it periodically with a soft cloth Avoid abrasive cleaners wire wool and harsh chemicals as these will dull the finish an...

Страница 10: ...them to be free of design and production faults at the time of delivery and that with correct use and care in accordance with our printed instructions they will function reliably Guarantee period s The guarantee is valid in private homes for 5 years from the purchase date Proof of purchase has to be provided when making a guarantee claim s By use in commercial or institutional applications the gua...

Страница 11: ...ts are protected by law and the use or reproduction outside the terms of an agreement is prohibited The right to modify designs and dimensions is reserved Christo Lefroy Brooks is a member of ACID Anti Copying in Design LEFROY BROOKS INC 1828 TROUTMAN STREET RIDGEWOOD NY 11385 TELEPHONE 718 302 5292 FAX 718 302 4177 COPYRIGHT LBIP LTD 2013 718 302 5292 www lefroybrooks com ...

Отзывы: