
5
MAINTENANCE 2
It is recommended to
perform maintenance 2 every 1000 operating hours
.
The
spare parts package 2
contains the following parts:
Spare parts package 2
Name
Quantity
Product number
Order number
Pin
1 pc.
5S5.000.K8.00.25.0
5S5.000.1Y.00.60.0
O-ring 45 x 1.5 mm
4 pcs.
095.015.E9.11.53.0
O-ring 50 x 1.5 mm
4 pcs.
095.015.E9.11.54.0
Gear unit
1 pc.
5S5.000.1Y.00.20.0
Turbine
1 pc.
5S5.000.T7.00.12.0
Collar bushing
1 pc.
5S5.000.1Y.00.13.0
The following steps from this maintenance manual are necessary for carrying out
maintenance 2:
Disassembly of housing
Steps 1 – 9
Correct inspection
Steps 19 – 20
Assembly of spray head with bearing unit
Step 27
Mounting of housing
Steps 33 – 36
Assembly of spray head with housing
Method A or B
4x O-ring ø 45x1.5mm
Material: EPDM
095.015.E9.11.53.0
4x O-ring ø 50x1.5mm
Material: EPDM
095.015.E9.11.54.0
1x Pin
Material: PEEK
5S5.000.K8.00.25.0
1x Gear unit
Material: 1.4404
5S5.000.1Y.00.20.0
1x Turbine
Material: ZX-324V2T
5S5.000.T7.00.12.0
1x Collar bushing
Material: 1.4404
5S5.000.1Y.00.13.0
Содержание XactClean HP+
Страница 1: ...21 Maintenance Instructions XactClean HP...