2. GETTING STARTED: ANALYSIS OF THE CLIENT SITE

During the visit to the facilities of the client, ensure that:
• The structure of the customer is capable to support the weight of the photovoltaic installation.
• The client has all the permissions for the construction of the photovoltaic system.

1.4 Compliance requirements of the installation

The installation must be made in accordance with the regulations in force in the place of installation.
The LEAF Microinverter M500-S must always be installed on a branch circuit with an external transient surge suppressor that 
must meet the requirements set out in IEC 61643-1 class II.
Where required, a dedicated detaching device must be installed.

4.3 Connecting to the PV panels

The LEAF M500-S microinverters may be connected to 1 or 2 photovoltaic modules, depending on module charateristcs: in the 
case of connection to a pair of modules, these must be previously connected in series as shown in figure 4.5.

Plug the DC connectors until the latch.
The DC connectors between the photovoltaic module and the LEAF Microinverter M500-S ìmust not be opened during             
operation of the microinverter: ensure that the PV system is disconnected from the AC grid before detaching the DC connectors.

Construction works of the PV system must be carried out carefully following the safety instructions for of the workplace, based 
on local regulations.

direct or indirect contact, only RCD or RCM Type B on the supply side of this product can be applied

Voltage drop in the AC wiring. 
An excessive length of the AC cables at the output of the microinverter may cause a voltage drop of a value such as to 
impair the connection to the distribution network: to ensure the efficient operation of the system, the voltage drop in the 
AC wiring harness must be checked through direct measurement (ideal), or through calculations, graphs or tables.
In case of excessive voltage drop, use cables with a larger cross-section.

Installation test, initial inspection
Before connecting to the mains, the wiring must be checked and tested to ensure that the regulatory requirements have 
been met.
The type and level of the tests must comply with the local and national rules.
The tests and the interpretation of the results should be conducted by qualified persons.

The LEAF Microinverter M500-S has no user-serviceable parts: do not try to open it or to carry out repairs.
Opening or tampering the LEAF Microinverter M500-S, and all the LEAF accessories, will result in immediate termination 
of the guarantee.
In case of fault, contact the installer or the LEAF customer support.

Once fixed to the structure of the photovoltaic system, no weights shall be put on top of the LEAF Microinverter M500-S. 
In any case, avoid falling objects or weights exceeding 10kg to be placed on top of the microinverter.

6

MICROINVERTER
CONNECTION

MICROINVERTER

CONNECTION

AC BUS EXTENSION

DISTRIBUTION UNIT

CAP

Fig. 4.4

Fig. 4.5

+

+

+

-

-

+

-

-

Содержание M500-S

Страница 1: ...MICROINVERTER M500 S Installation Manual...

Страница 2: ...November 2014 Copyright LEAF SpA...

Страница 3: ...ting the AC BUS 4 2 1 Connection without WIELAND distribution units 4 2 2 Connection with WIELAND distribution unit 4 3 Connecting to the PV panels 4 4 Connecting the AC distribution network Grid 9 9...

Страница 4: ...t may affect the proper functioning of the device HOT SURFACE It indicates operations that may cause burns and serious damage in case of contact with hot surfaces NOTE It is used to highlight particul...

Страница 5: ...nd connection of the metal housing when required by the rules of installation of the photovoltaic system must be carried out through the appropriate threaded socket marked with the grounding symbol an...

Страница 6: ...the microinverter may cause a voltage drop of a value such as to impair the connection to the distribution network to ensure the efficient operation of the system the voltage drop in the AC wiring ha...

Страница 7: ...l inform the client about the best suited configuration based on the system architecture and clients needs Each microinverter is an independent production unit safe and efficient it can then be instal...

Страница 8: ...nected to the distribution network through the protective equipment defined by local regulations WARNING If exposed to sunlight the solar modules will always exhibit DC voltage at their electrical ter...

Страница 9: ...sequence of operations Connecting the AC bus of the PV system at all the LEAF M500 S microinverters Connecting all the LEAF M500 S microinverters to their respective panel or to the pair of solar pane...

Страница 10: ...n cables up to 3 AC lines from microinverters and up to 2 cables for connecting to the distribution network As depicted in fig 4 3 and 4 4 several arrangements are possible when more distributors are...

Страница 11: ...ed in series as shown in figure 4 5 Plug the DC connectors until the latch The DC connectors between the photovoltaic module and the LEAF Microinverter M500 S must not be opened during operation of th...

Страница 12: ...rk through the protective equipment defined by local regulations All the parts of the plant must be kept dry before and during installation and connection 5 REMOVING A LEAF MICROINVERTER M500 S Isolat...

Страница 13: ...re grounding Grounding is ensured by the dedicated conductor on the AC side its connection should be performed based on natio nal laws for grounding wires The use of the ground connection of the metal...

Страница 14: ...IN 1 INSTALLATION MAP CLIENT DATA INSTALLER DATA ORIENTATION Insert geographical orientation and roof slope Company 4 3 Roof section N ___ A Te In 2 5 14 Address City Company Address City...

Страница 15: ...nge 48 3 48 3 nominal power Low Voltage Fault Ride Through LVFRT Yes Max Output Fault Current 5 6 A Internal Input Transient Overvoltage Protection Yes Max Units per Branch Circuit 9 15 for 20 32A bre...

Страница 16: ...ntries across the globe The mission of VeNetWork is to promote business culture via the funding and development of new manufacturing companies and service providers that will generate economic profess...

Отзывы: