background image

Product maintenance

Product recycling

In order to assure that the solar panel receive the light efficiently, please use clear water 

to clean the dirt mark on the surface of the panel regularly and prohibit the use of 

chemical or abradant which includes chlorobenzene.
Only manufacturer, service agent or qualified personnel can replace the light source or 

other circuit components of the lighting device. Without authorization, using the third 

party component to replace is prohibited or it would cause serious damage to the 

product. if the user disassembles the product without authorization, warranty becomes 

void.
If you need to replace the components /accessories, please go to 
www.leadsun.com.au, or contact your local distributor .

The product is made of recyclable high-performance materials and components, please 

don't dispose with other household garbage. 
Please understand the local rules about the separate collection of electronics and 

electrical products, dispose the waste products in the right way that avoids potential 

negative effects to environment and human health. 

Cautions

Transportation and storage

Working condition

Attention

Please read the below cautions carefully before using the AE6 series solar 

street light to avoid physical injury and product failure caused by improper use.

Product protection grade Ip65
High tensile structure design can withstand level 3 typhoon (58m/s), beyond this level 

might cause damage to the street light.
Working temperature range from -20

°C

 to 60

°C

 (charging temperature is limited within 

0

°C

 to 60

°C

). The product with heating function can work under -40

°C

 to 60

°C

.

The product contains high capacity lithium-ion battery components, please  follow the 

aviation transport law. Please regard the product as the flammable and explosive 

hazardous substance and store it separately from other goods.
The solar panel of the product is fragile, tier limitation is two layers. No stacking out of 

limits and No press with heavy stuff.
Store the product under the temperature from 0

°C

 to 45

°C.

It should be charged every six months if the product is stored for long time. please use 

the special charger to charge the product (the charger needs additional purchase) in 

order to avoid battery or device damage.

1

2

A licensed electrician is required to install the unit with an AC power supply. 

If this product contains the main power supply it must be installed by a licensed electrician. 

Please ensure this light fixture is installed in accordance to local regulations. 

Содержание AE6 Series

Страница 1: ...ddress NO 1 Pingdong 1st Rd Nanping Science Technology Industrial Park Zhuhai China 519060 Phone Fax 86 756 2289712 86 756 8682090 Email sales leadsunglobal com LEADSUN INC Address 1920 S Archibald Av...

Страница 2: ...read the below cautions carefully before using the AE6 series solar street light to avoid physical injury and product failure caused by improper use Product protection grade Ip65 High tensile structu...

Страница 3: ...the motion sensor 5 LED Illumination 6 USB Type B Port Special port for programming 7 Switch button ON OFF or Turn ON OFF the light 8 USB Type A charging port Charging for the battery please use 14V 1...

Страница 4: ...he OFF mode ON mode the system will work normally charging in the daytime and discharging at night 2 Start up Daytime start up when the lighting condition is sufficient 30lx the light will illuminate...

Страница 5: ...ace to the north See Picture 1 1 Installation conditions Make sure the sunlight is not blocked by any constructions or trees during the installation or it will affect the charging and discharging effi...

Страница 6: ...o 14N m See Picture 5 Connect the solar power system with the extended cables in the light pole and lock the connectors in turns Embed the light pole into the X bracket and use the dedicated tools to...

Страница 7: ...ion the gateway system is recommended to be installed in the center of all the street lights 12 11 LORA Terminal antenna installation Gateway antenna intallation Insert SIM Card Insert the 4G SIM card...

Страница 8: ...normal work mode Replace the controller or reprogram the controller program 4 Abnormal motion detection Check if the lighting environment temperature is same as that of human body temperature If the...

Отзывы: