
8 Assembly
8.1 Mounting the Supply Unit.
ü
All wires on the back of the PowAirBox are correctly connected.
1. Push the supply unit into the body cutout.
2. Remove the 6 threaded pins.
3. Insert the 6 M4 screws (Allen 2.5 mm) and tighten the screws until the body
seal is flat.
4. To prevent accidental loosening of the screws, apply a threadlocker, e.g
Loctite 243.
ð
The PowAirBox supply unit is mounted and ready to use.
8.2 Connecting the Coupling
TIP
Device defect due to faulty ejection
Incorrect ejection of the coupling due to a tensioned combination
cable can lead to equipment failure.
1. Do not use cable winders or similar in the vehicle depot.
2. When plugging in, make sure that the combination cable
hangs loosely and is not taut.
To connect the coupling, proceed as follows:
NOTE!
The auxiliary contacts of the coupling are bridged at the factory in or-
der to establish a start locking mechanism.
1. Connect the connection lines of the combination cable to the power and
compressed air distribution in the vehicle hall. The wires in the combination
cable are numbered accordingly.
2. Connect the connecting leads of the electric cable to the power distribution
in the vehicle depot.
ð
The coupling is connected.
CAUTION!
To ensure smooth operation, ensure that the coupling does
not touch the depot floor when unplugged. LEAB recommends a distance of
approx. 70 cm from the depot floor.
14
LEAB Automotive GmbH
Thorshammer 6
24866 Busdorf
8 Assembly
LEAB Automotive GmbH