8.3 Optional: Mounting the Ceiling Bracket
1 Mounting frame
2 Cover
3 Assembled mounting frame and
cover
1. Select a mounting location with a lateral distance of approx. 30 cm from the
vehicle.
2. Install the mounting frame (1) on the depot ceiling.
3. Guide the cover (2) onto the coupling’s combination cable.
4. Insert the combination cable through the bracket opening on the mounting
frame.
NOTE!
If necessary, remove individual sealing rings from the bracket open-
ing.
5. Connect the coupling lines with the power and compressed air distribution
at the vehicle depot. (see connection diagram).
6. Slide the cover over the mounting frame and fasten it with the screw cap.
ð
The ceiling bracket is mounted.
9 Operation
Notice
Contact erosion when pulling under load
Contact burnout may occur when pulling under load.
1. Do not pull the coupling out of the supply unit when under
load.
2. LEAB recommends using only automatic ejection.
15
LEAB Automotive GmbH
Thorshammer 6
24866 Busdorf
LEAB Automotive GmbH
9 Operation