![Le Panyol 100 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/le-panyol/100/100_assembly-instructions-manual_1864495016.webp)
Phase 3 : Placing the keystone
16
Place the jack and the wood specers in the center of the oven floor and aligned with the
axis.
These wood specers will facilitate the withdrawal of the jack when the dome will be
assembled. We will refine the position of the jack in next steps.
Check that the total height of the jack is 34 cm.
Axis
34 cm
Position the keystone on the jack.
Consult
the video
The keystone is in 2 parts.
You have to assemble the 2 parts thanks to
the 2 provided spindles. Insert them in the
pre drilled holes.
To maintain the keystone, use a jack and 4
wedges like on the photo.