PDU6M MANUAL V0.1
Page 08 of 22
ENGLISH
8
Luci della Ribalta srl - Via Berna 14, Z.I. Bosco dell’Irta, 46042 Castel Goffredo MN, Italy
tel. +39 0376 771 777 - fax +39 0376 772 140 - email [email protected] - web www.ldr.it
6.
INSTALLATION
7.
OPERATION
7.1
CONNECT TO POWER
7.2
SELECT THE WORKING MODE
Set the power selection switch to the locally supplied power and connect the power cable.
A p
You can choose the desidered working mode according to the control signal type and the
colour scroller type. If the colour scroller has no limitations on the control signal, we
strongly recommend you select the NORMAL working mode.
For more details on the available options please go back to page 4 of this manual
ower cord is supplied with the PDU and is fitted with a CEE 22 socket at one end and
with a Schuko plug at the other end.
Note: the signal transmission state depends on the selected working mode
This unit can be installed either on a working surface or hanging from a trussing.
Before installing this product make sure the structure you are fixing the product to can
withstand its load and the total load of any other unit installed.
1. Hang the unit to the structure and firmly tighten the bolt of the clamp
2. Open the safety bond, secure it to the hanging bar and lock it back to the PDU
NOTE: make sure you select the desired working mode
the PDU6M is connected to
power
before