28
•
The long rigging link.
1. Unroll the jib and connect the tack (lower forward corner) to the shackle
attached to the lower furling unit in the tack bar (see picture 4.17).
2. Attach the top furling unit to the wire end of the jib halyard, using the
shackle provided (see picture 4.18).
3. Attach the head (top corner) of the jib to the top furling unit (see picture
4.19).
4. At the base of the mast, pull the jib up using the halyard. When the
halyard is pulled all the way up a wire loop will emerge.
5. Hook the rig tension to this wire loop (see picture 4.20), then pull the rig
tension on, ensuring it is in the cleat properly. You should pull enough
tension into the rig so the shrouds feel firm when pulled on.
Picture 4.17 The tack of the jib
Picture 4.18 The top furling unit.
Picture 4.19 The head of the jib attached.
Picture 4.20 Connecting the rig tension.
1. Find the middle of the jib sheet and tie a knot just to one side.
2. Pass one end through the rigging link and pull through until the knot.
3. Tie a knot on the other side (see picture 4.21).
Содержание RS Vision
Страница 3: ...3 6 MAINTENANCE 7 1 Boat Care 7 2 Foil Care 7 3 Spar Care 7 4 Sail Care 7 WARRANTY...
Страница 26: ...26...