+1.800.867.4580 [email protected] www.laundryjet.com
8
3.1
Pipe Installation Overview
Pipe Installation Standards
Required Piping Installation Standards
All joints must use a minimum entry angle of 45 degrees with a break distance of 18
Inches (460 MM). See Image below.
Pipe cuts must be straight and de burred before seating.
Pipe must be completely seated in fitting connections.
Seal all joints using standard PVC glue.
Connections must be glued around 360 degrees
to ensure maximum system performance.
System must be strapped with “plumbers tape”
(or equivalent) every 6 feet. Port 90 must be
strapped and secured prior to Port installation.
Install Cleanout ports every 50 feet on angled runs. Straight trunk lines can run up
to 100 feet with cleanouts at either end.
Pipe Installation
Содержание Plus
Страница 2: ...1 800 867 4580 sales laundryjet com www laundryjet com 2 INSTALLATION GUIDE...
Страница 30: ...1 800 867 4580 sales laundryjet com www laundryjet com 30...
Страница 31: ...1 800 867 4580 sales laundryjet com www laundryjet com 31...
Страница 32: ...1 800 867 4580 sales laundryjet com www laundryjet com 32...
Страница 33: ...1 800 867 4580 sales laundryjet com www laundryjet com 33...