background image

LAUNCH

 

 

                                                

               TLT632AF INSTALLATION MANUAL 

 

                                                  11 

10.

 

Do not wear metal frame glasses, metallic necklaces or 
chains while working on any electrical equipment. Also do 

not wear any ring, watch or bracelet while operating 
electrical equipment.

8 Parts List

 

This parts list is only to be used by maintenance and servicing personnel.     
The manufacturer is not responsible in case it is used for any other purposes. 
If any parts get damaged, please order from your dealer or Launch Tech. 
 
 

 
 
 

Содержание TLT632AF

Страница 1: ...2 5 Pneumatic Diagram 6 3 Tools 7 4 Unpacking 7 5 Installation 7 5 1 Basic Requirements 7 5 2 Installation Procedures 7 5 2 1 Base Frame Installation 7 5 2 2 Control Desk Installation 8 5 2 3 Hydrauli...

Страница 2: ...facturer may lead to direct or indirect damage to the product Installation and adjustment personnel should have an understanding of electronic equipment Never allow untrained personnel to operate the...

Страница 3: ...LAUNCH TLT632AF INSTALLATION MANUAL 3 2 Structure and Working Principle 2 1 Structure Fig 1...

Страница 4: ...platform upward Release button SB1 the platform will stop rise Keep pushing button SB1 when the platform reaches at the Max height release valve will be activated and protect the lift Safety Locking p...

Страница 5: ...LAUNCH TLT632AF INSTALLATION MANUAL 5 2 3 Hydraulic Diagram 1 2 3 4 5 6 7 7 8 8 9 9 10 10 P 11 Z1 Z2 F2 F1 Fig 3 2 4 Hydraulic Components in Control Desk Fig 4 F2 Z2 Z1 F1...

Страница 6: ...wering valves 9 to lower the lift slowly and carefully The lowering speed can be adjusted by speed valve 11 To equalize two platforms open 2 equalization valves 8 raise the lift up and down 1 or 2 tim...

Страница 7: ...tolerance of the concrete floor levelness should not exceed 5mm 0 2 Slight slope can be corrected with shims Excessive slope on the ground will greatly affect the performance of the lift In this case...

Страница 8: ...olerance should less than 6mm 0 24 Drawing the frame is very important Poor drawing will cause many problems about assembly and operation 5 3 Control Desk Installation Place the control desk in place...

Страница 9: ...d make sure the oil level is above the standard level 5 5 Anchoring Wrap the oil fittings cable connections and joints of the lift to prevent dusts from getting in Raise the platforms to 1 5m then ins...

Страница 10: ...jected Refer to Fig 4 and cylinder adjustment adjust the platforms to the same level Notice Attention should be paid to the position of oil pipes and hydraulic hose when the platforms move to the mini...

Страница 11: ...ical equipment Also do not wear any ring watch or bracelet while operating electrical equipment 8 Parts List This parts list is only to be used by maintenance and servicing personnel The manufacturer...

Страница 12: ...19 Sliding block 16 201021437 Platform 17 104991230 Supporting block 18 201021502 Platform 19 201021439 Supporting bracket 20 Y201013184D Connecting axle 21 103202061 Spring 22 103202063 Cylinder asse...

Страница 13: ...pe bending head 3 5M high pressure oil hose 103 103260188 C type 2M high pressure oil hose 104 103260189 C type bending head 2 5M high pressure oil hose 105 103260193 C type 0 8M high pressure oil hos...

Страница 14: ...LAUNCH TLT632AF INSTALLATION MANUAL 14 103990191 Power unit assembly 220V 60Hz three phase 103990192 Power unit assembly 220V 60Hz single phase 103990193 Power unit assembly 200V 60Hz single phase...

Страница 15: ...tifier 203 103180018 Connecting board 204 102110059 Contactor 205 102150053 Fuse 206 102240039 Solenoid valve 207 102100137 Button 208 102100087 Power switch 209 102140018 Alarm 210 102990065 Indicati...

Отзывы: