background image

LAUNCH  

Installation Instruction for Economical Symmetric Floor-plate 2-post Lift

 

16 

Diagram of electrical system for Single-phase motor 
 

AC500V,20A 
switch  prepared 

by user

 

KM-AC Contactor

 M-Motor

SB-Start button 

Diagram of electrical system for three-phase motor 

 

KM-AC Contactor

 M-Motor

SB-Start button 

 

FR-Overheat Relay    
The electrical working principle is as follows: 
Press the start button (SB), and the contactor (KM) will be 
closed; motor (M) is energized to drive the gear pump for oil 
supply so as to push the carriage upward; release the start 
button, and the contactor (KM) is open, then the motor (M) 
will lose the power, so the carriage will stop lifting. 

  

 
 

Diagram of hydraulic system 

 

 

2

3

1

4

5

7

6

8

8

9

9

1 0

1 1

 

1-Gear pump, 2-motor, 3-oil filter, 4-check valve, 
 5-safety valve,6-manual lowering valve  7-Sevo  flow –
control valve, 8-hose,,9-hydraulic cylinder, 10-level gauge, 
11-air filter 
 

Working principles of hydraulic system:

 

When the button is pressed to start the motor on the power 

unit, the motor 2 will be actuated to put the oil pump 1 into 

motion; and oil will be sucked from the oil tank and sent to 

cylinder 10 forcing the piston move upward. At this time, the 

safety vale 5 is at the “Closed” position. (The pressure is 

well adjusted before leaving the factory to ensure the rated 

capacity. However, when the system pressure exceeds the 

limit, the oil will automatically overflow). When the start 

button is released, the oil supply will stop so as to stop the 

lifting operation. For lowering the carriage, first start up the 

motor to raise the carriage a little, pull the steel ropes on the 

two carriages to disengage the safety locking status; and 

then press the manual lowering handle valve 6 to lower the 

carriage. 

 

 

Содержание TLT235SB

Страница 1: ...te layout 5 5 2 3 Install the powerside column 5 5 2 4 Install the floor plate 6 5 2 5 Install the offside column 6 5 2 6 Install and adjust the balancing steel cables 7 5 2 7 Install the power unit 7...

Страница 2: ...cause direct or indirect damage to the machine and injury on operators z To do the installation and adjustment the personnel must have certain electrical knowledge z The operators must undergo special...

Страница 3: ...and working principles 2 1 Structure schematic diagram TLT235SB TLT240SB the Floor plate two post lift structure is shown below Figure 1 Figure2 SWING ARM FLOOR PLATE CARRIAGE 3370 min110 LIFTING PAD...

Страница 4: ...point of the vehicle and then adjust the screw height below the pad to adapt to different heights of vehicle chassis z Balancing mechanism To keep the balance during the lifting and lowering process...

Страница 5: ...treated properly 5 Installation 5 1 Important notice z The wrong installation will cause the lift damage or personal injury The manufacturer will not undertake any responsibilities for any damage caus...

Страница 6: ...4 3 5 Fig 4 5 2 2 Base plate layout As shown in Fig 4 z With total width A as the basis draw two parallel lines 1 and 2 on the concrete slab with the error within 3mm z Determine the powerside column...

Страница 7: ...only use the torque wrench and don t use impact tool for fastening Insert proper shims under the base of column if necessary making the column vertical Note The thickness of shims shouldn t exceed 5mm...

Страница 8: ...teel cables as shown in Fig 6 z Adjust the tension of cables through the adjustment nuts on each end of steel cable The steel cables should be tight in equal tension Each steel cable should be ensured...

Страница 9: ...f the lift is used outdoors it is recommended to set a cover on the power unit such damages to the motors caused by the water or other liquids like the detergent acid etc are not covered by warranty 5...

Страница 10: ...sted properly by the manufacture Fig 10 making the swing arm move freely at the lowest height without scratching the ground The customer can make fine adjustment for chains after the electrical and hy...

Страница 11: ...d the carriage rises stop pressing the button then the carriage will stop In order to lower down the carriage first pull the steel rope for the safety locks on the two carriages one time for each In c...

Страница 12: ...f the lift components This list is only used as the information for the maintenance and repair Our company will not be liable for other uses In case of damages to the components purchase can be made f...

Страница 13: ...LAUNCH Installation Instruction for Economical Symmetric Floor plate 2 post Lift 12...

Страница 14: ...LAUNCH Installation Instruction for Economical Symmetric Floor plate 2 post Lift 13...

Страница 15: ...r 17 11AD065A Flat washer 12 18 11AD090A Spring washer 12 19 11AB376A Bolt M12 35 20 11AD056A Flat washer 10 21 11AD116A Spring washer 10 22 11AB375A Bolt M10 25 23 11AJ072B Steel cable 24 11AB969A An...

Страница 16: ...ssembly 210 11BC154B Pin axle 211 11MC128B Swing arm 212 11AE039B Spring 213 11BE112A Gear block 214 11AG528A Pin 5X40 215 11AD093A Returning ring 40 216 11AG011A Pin 3 26 218 11AD126A Washer 8 219 11...

Страница 17: ...lve 5 safety valve 6 manual lowering valve 7 Sevo flow control valve 8 hose 9 hydraulic cylinder 10 level gauge 11 air filter Working principles of hydraulic system When the button is pressed to start...