background image

© Elektronik-Systeme LAUER GmbH & Co. KG • Kelterstr. 59 • 72669 Unterensingen • Tel. 07022/9660-0 •  Fax 07022/9660-103

36

Unscrew the board holder.

Insert your PCI-board.

Please ensure a correct fit at the lower edge of the slot.

Screw your PCI-board tight.

4

Service

Содержание EPC PM 1200

Страница 1: ...CiS Nr 360 610 0110 Reg 10508 0605 Version 2 09 05 Elektronik Systeme LAUER GmbH Co KG User manual EPC PM 1200 EPC PM 1500 EPC PM 1700 EPC PM 2100 EPC PM Box ...

Страница 2: ... a software back up copy for private use We reserve the right to make amendments to the manual without prior notice We can not guarantee the accuracy and correctness of the programmes and data stored on the CD ROM Helpful suggestions improvements as well as references to errors are welcome at any time The stipulations are also valid for any special annexes to this manual Microsoft Windows 2000 Win...

Страница 3: ...lic Names of pushbuttons to be used menus or other screen elements as well as brand names are shown in italic letters Necessary basic knowledge A solid Knowledge of the personal computer and Microsoft operating systems is assumed and a general knowledge in the area of automation technology is recommended Approbation s standards You will find information in the annex chapter certificate and guide l...

Страница 4: ...hest level is used if various danger levels occur When a warning advise with a warning triangle warns about perso nal damage then an additional warning for material damage can be added Qualified personnel The described appliance may only be installed and operated in accordance with this documentation Only qualified personnel may put it into operation and operate this appliance Qualified personnel ...

Страница 5: ...Motherboard slots memory module 15 3 Putting in to operation 17 3 1 Power supply 17 3 2 Earthing system 18 3 3 Assembly 19 3 4 operating system 20 3 5 BIOS settings 21 3 6 Important items regarding software installation 23 3 7 Touch installation 6 10 Windows 2000 XP 24 3 8 Graphic board installation 28 3 9 Installation LAN network card 29 4 Service 31 4 1 Changing the fan 32 4 2 PCI board installa...

Страница 6: ...co operation with our customers persuasive concepts are developed harmonising efficiently man and interface Proximity to customers the direct dialog is the basis of our success Support contact Telephone 49 0 7022 9660 209 eMail Support systeme lauer de for support inquiries always have the serial number of your appliance at hand Up to date driver units software driver units manuals and innovations...

Страница 7: ...nces running on DC supply comply with the EC directive 89 336 EEC electromagnetic compatibility and are according to the CE marking designed for following applications Application Standard Emitted interference interference resistant industrial EN 61000 6 4 2001 EN 61000 6 2 2001 low voltage directive 230V The appliances running on AC supply comply with the EC directive 73 23 EEC low voltage direct...

Страница 8: ... Elektronik Systeme LAUER GmbH Co KG Kelterstr 59 72669 Unterensingen Tel 07022 9660 0 Fax 07022 9660 103 0 8 ...

Страница 9: ...ce pass is supplied with every appliance It contains important information for the user Ready to hand are important address data serial number then there are the components and type designation corresponding with the company internal appliance designation Also shown are all components contained in the system therefore the CPU and hard disk type or the operation system are easily identifiable for t...

Страница 10: ...en contact of the EPCPM Note Key Version of the EPC PM with keyboard on the front plate you can install the program Keyconf under E Tools Keyconf for configuring the individual keys The software is self describing over the menu guidance 1 2 Preparing the installation of the appliance Open the package and check whether the contents match the list above The cardboard box should be kept for an eventu...

Страница 11: ...UER GmbH Co KG Kelterstr 59 72669 Unterensingen Tel 07022 9660 0 Fax 07022 9660 103 11 2 Description 2 1 Installation The installation of the PPC is independent of the display size shown as follows 1 Frontunit 2 PC unit 1 2 ...

Страница 12: ...erensingen Tel 07022 9660 0 Fax 07022 9660 103 12 2 2 Display Display sizes of 12 15 17 and 21 are available alternatively with Touch or keyboard and Touch Pure Touch variants available in 12 15 17 and 21 Touch key variants available in 10 and 15 2 Description ...

Страница 13: ... Elektronik Systeme LAUER GmbH Co KG Kelterstr 59 72669 Unterensingen Tel 07022 9660 0 Fax 07022 9660 103 13 2 3 Ports 24 V panel 2 Description ...

Страница 14: ... Elektronik Systeme LAUER GmbH Co KG Kelterstr 59 72669 Unterensingen Tel 07022 9660 0 Fax 07022 9660 103 14 230 V panel 2 Description ...

Страница 15: ...with the supplied materials Notice Individual slots may be part of the supply depending on configuration and customer requirements The quality of the memory module may influence the system stability Please only use memory modules cleared by Systeme LAUER Memory modules are electrostatic sensitive components Relevant protective measures earth have to be considered during assembly disassembly ESD pr...

Страница 16: ... Elektronik Systeme LAUER GmbH Co KG Kelterstr 59 72669 Unterensingen Tel 07022 9660 0 Fax 07022 9660 103 16 2 Description ...

Страница 17: ... voltage in accordance with EN60950 The controlling transformer has to comply with EN60742 Check the power supply system with the relevant data on the type plate All cable connections have to be checked prior to putting the system in to operation It has to be ensured that all voltages and signals comply with the rele vant specifications 1 fuse 6 3 A 1 power supply 24V 3 earth screw The power suppl...

Страница 18: ... interference Appliance and switch board have to be connected to the nearest possible central earthing point make sure of a possibly low inductive connection between appliance and switch board All data cables connected to the appliance have to be the screened type The screens have to be earthed on both sides There has to exist a low ohm connection between the connected systems High equalising curr...

Страница 19: ...e heat generated in the appliance a free space for air circulation of 100 mm has to be provided around the appliance The assembly takes place by hexagon nuts or retaining blocks depending upon the version of the EPC PM Notice Possibility of damage to the appliance Protection class IP65 to the front panel is only guaranteed with a perfect fitting seal Pay attention to the torque when fixing the fro...

Страница 20: ...FS Windows XP professional German and English C and D NTFS depending on the configuration the respective user interface of the installed operating system appears once the EPC has booted from the hard disk Compact Flash Card Version Windows embedded XP Wir stellen kundenspezifische Konfigurationen als Dienstleitung zusam men Without operating system If no operating system is present the message DIS...

Страница 21: ...9660 0 Fax 07022 9660 103 21 3 5 BIOS settings Settings DFI ACP G5M100N Switch on the EPC PM and press the DEL i e Entf button shown in the first screen image to start the set up 3 Putting in to operation Select the menu item Load Optimised Default and affirm the selected operation ...

Страница 22: ... HD CDundCF werecorrectlyrecognised AdvancedBIOSFeatures First Boot Device HDD 1 AdvancedBIOSFeatures SecondBootDevice HDD 0 AdvancedBIOSFeatures ThirdBootDevice Disabled AdvancedBIOSFeatures BootOtherDevice Disabled AdvancedBIOSFeatures Boot up Floppy Seek Disabled AdvancedChipsetFeatures PanelNumber 12 2 800x600 18 bit 15 8 1024x768 24 bit 17 undBox 4 1260x1024 48 bit 21 10 1600x120048 bit Integ...

Страница 23: ... an electron beam for image formation and therefore no improvement is achieved from a higher setting Higher settings can even result in the destruction of the graphic board display install the touch drivers in accordance with the instructions Notice To avoid always having to re start the installation procedure of the operating system we recommend image production of the new hard disc for example N...

Страница 24: ...allation 6 10 Windows 2000 XP technical data check the BIOS entries when re installing SerialTsharc 12Touch Controller Com 3 check the BIOS entries 3E8 hex IRQ 4 9600 bps Carry out the SETUP EXE under drive E Driver Driver EPC PM Touch Touch with the ordered operation system CD ROM D E EPC PM Touch 3 Putting in to operation ...

Страница 25: ...nik Systeme LAUER GmbH Co KG Kelterstr 59 72669 Unterensingen Tel 07022 9660 0 Fax 07022 9660 103 25 follow the instructions on the monitor press CONTINUE accept the license provisions 3 Putting in to operation ...

Страница 26: ...onik Systeme LAUER GmbH Co KG Kelterstr 59 72669 Unterensingen Tel 07022 9660 0 Fax 07022 9660 103 26 select the Auto detect Function or manually select the technical connection data 3 Putting in to operation ...

Страница 27: ... 9660 103 27 Press the finalise Button and follow the instructions for a re start After a re start of the operating system you will find amongst the programs the entry Hampshire Control Panel Calibrate the touch screen with your finger or with a rounded pointed touch pen 3 Putting in to operation ...

Страница 28: ...lation window for the automatic driver search of the grafic board driver The grafic driver is on the delivered Driver CD or on Partition E EPC PM Grafic Start SETUP EXE in the directory UTILITIES and accept the following messages Attention The grafic driver will be installed 2x After conclusion the installation and restart the PPC the following entries can be seen in the Control Panel or in the di...

Страница 29: ...call up the EXE file from the drive directory drive E Driver EPC PM LAN for the installation of the second network card confirm each installation step and re start the EPC PM at the end of the installation After the re start 2 new network icons appear in the right hand side lower taskbar You can now configure both network cards to your own needs IP address etc via the system control Via the MS DOS...

Страница 30: ... Elektronik Systeme LAUER GmbH Co KG Kelterstr 59 72669 Unterensingen Tel 07022 9660 0 Fax 07022 9660 103 30 3 Putting in to operation ...

Страница 31: ...ot damage the front panel of the EPC PM Open the appliance All operations to the opened appliance may only be carried out by authorised personnel Only the expansion of hardware with memory and plug in cards is permissible within the defects liability period Attention There are electronic components within the appliance which can be destroyed by electrostatic charges Therefore cautionary measures h...

Страница 32: ... 9660 103 32 4 1 Changing the fan To change the fan you have to remove the left hand part of the rear enclosure To open the enclosure remove the marked screws with an Allen key Then lift the enclosure and pull out the fan cable Danach den Deckel anheben und das Lüfter Kabel herausziehen 4 Service ...

Страница 33: ...0 103 33 Please note the correct location of the cable prior to pulling the cable out so that the new fan can be plugged in correctly Remove the protective cover of the fan and remove the fan with a Phillips head screw driver After changing the fan assemble the appliance in the reverse order 4 Service ...

Страница 34: ...2 9660 0 Fax 07022 9660 103 34 4 2 PCI board installation To install a PCI board the right hand side part of the rear enclosure has to be removed To open the enclosure remove the marked screws with an Allen key After removing 7 screws the enclosure can be lifted easily 4 Service ...

Страница 35: ...H Co KG Kelterstr 59 72669 Unterensingen Tel 07022 9660 0 Fax 07022 9660 103 35 A look at the opened appliance shows the 2 PCI slots and the board holder Remove the slot cover of the desired slot to insert your PCI board 4 Service ...

Страница 36: ...R GmbH Co KG Kelterstr 59 72669 Unterensingen Tel 07022 9660 0 Fax 07022 9660 103 36 Unscrew the board holder Insert your PCI board Please ensure a correct fit at the lower edge of the slot Screw your PCI board tight 4 Service ...

Страница 37: ...er has to be re fixed To ensure an optimal use of the board holder we suggest that you put wide boards in the lower slots and narrow boards in the upper slots Following picture shows this once more in detail The short support can be removed with boards of the same design Otherwise the two supports can be individually adjusted 4 Service ...

Страница 38: ...ange To change the memory board you have to remove the left hand part of the rear enclosure To open the enclosure remove the marked screws with an Allen key Then lift the enclosure and pull out the fan cable Please note the correct location of the cable prior to pulling the cable out so that it can be plugged in correctly 4 Service ...

Страница 39: ... 39 Put the enclosure to one side and you have a free view of the slots Pull out ribbon cable see arrow and move it to the top The picture shows a free and an occupied slot If a memory expansion is carried out the memory module is positioned vertically and pushed in the fixing brackets snap shut 4 Service ...

Страница 40: ...hanged then the holding brackets have to be pushed outwards simultaneously The memory board is now loose and can be removed Locate the memory board vertically and push it down the brackets snap shut Bend back and plug in the ribbon cable Subsequently plug in the fan cable and reposition the enclosure Re fix the enclosure 4 Service ...

Страница 41: ...ME with integrated graphic up to UXGA Memory Slots 2x DDR SDRAM bis max 2GB Memory Compact Flash or 2 5 HD optionally with extended temperature range Extension Slots 2x PCI bis 220mm lang 1x CF Card Typ II Interface 1x PS 2 Keyboard 1x PS 2 Mouse 1x VGA 3x RS232 1x Parallel 2x Ethernet 10 100 4x USB2 0 Audio power supply DC 24 VDC 15 polarity safely 4A max Switch on peak 15A power supply AC 115 23...

Страница 42: ...f 10 Tr 30 Tf 5 Tr 20 Tf 10 Tr 15 Tf 10 Tr 15 Tf DisplayTechnology TN TN TN PVA PVA TouchscreenTechnology Resistiv Touch resolution 4096 x 4096 Punkte Keyboard Short stroke keys Life span short stroke keys 1 Mio Tipps environment conditions Protection type IP 65 front site IP 20 back site for DIN EN 60529 Temperature Operating0 45 C Storage 20 65 C Humidity 90 r f not condensing Vibration in the e...

Страница 43: ...022 9660 103 43 5 1 Detailed drawings 5 1 1 EPC PM 1200 frontal view overall measurement 364 0 x 296 0 mm Front panel assembly aperture Aperture size 344 0 x 276 0 mm Type of mounting with 8 pieces into the front plate pressed in thread pin M4 x 16 Max 5 mm thick mounting frame 5 Technical data ...

Страница 44: ... LAUER GmbH Co KG Kelterstr 59 72669 Unterensingen Tel 07022 9660 0 Fax 07022 9660 103 44 view of the appliance s underneath lateral view Appliance s rear view lateral view View of the equipment top side 5 Technical data ...

Страница 45: ...60 0 Fax 07022 9660 103 45 5 1 2 EPC PM 1500 frontal view overall measurement 452 0 x 357 0 mm Front panel assembly aperture Aperture size 429 0 x 334 0 mm Type of mounting with10 pieces into the front plate pressed in thread pin M4 x 16 Max 5 mm thick mounting frame 5 Technical data ...

Страница 46: ... LAUER GmbH Co KG Kelterstr 59 72669 Unterensingen Tel 07022 9660 0 Fax 07022 9660 103 46 view of the appliance s underneath lateral view Appliance s rear view lateral view View of the equipment top side 5 Technical data ...

Страница 47: ...60 0 Fax 07022 9660 103 47 5 1 2 EPC PM 1700 frontal view overall measurement 480 0 x 377 0 mm Front panel assembly aperture Aperture size 454 0 x 351 0 mm Type of mounting with14 pieces into the front plate pressed in thread pin M4 x 16 Max 5 mm thick mounting frame 5 Technical data ...

Страница 48: ... LAUER GmbH Co KG Kelterstr 59 72669 Unterensingen Tel 07022 9660 0 Fax 07022 9660 103 48 view of the appliance s underneath lateral view Appliance s rear view lateral view View of the equipment top side 5 Technical data ...

Страница 49: ...60 103 49 5 1 3 EPC PM 2100 frontal view overall measurement 527 0 x 419 0 mm Front panel assembly aperture Aperture size 498 0 x 390 0 mm Type of mounting with14 pieces into the front plate pressed in thread pin M4 x 16 Attachment with 14 pieces of nuts Max 5 mm thick mounting frame 5 Technical data ...

Страница 50: ... Elektronik Systeme LAUER GmbH Co KG Kelterstr 59 72669 Unterensingen Tel 07022 9660 0 Fax 07022 9660 103 50 view of the appliance s underneath Rear view of the appliance lateral view 5 Technical data ...

Страница 51: ...nik Systeme LAUER GmbH Co KG Kelterstr 59 72669 Unterensingen Tel 07022 9660 0 Fax 07022 9660 103 51 5 1 4 EPC PM Box view of the appliance s underneath Rear view of the appliance lateral view 5 Technical data ...

Страница 52: ... Elektronik Systeme LAUER GmbH Co KG Kelterstr 59 72669 Unterensingen Tel 07022 9660 0 Fax 07022 9660 103 52 ...

Отзывы: